Mostrar el registro sencillo del ítem
Diseño de un sistema de gestión de seguridad y salud ocupacional y un sistema de gestión ambiental para reducir los costos operativos en la sub gerencia de obras de la MPT
dc.contributor.advisor | Rojas Ciudad, Carlos | |
dc.contributor.author | Cabeza Chávez, Manuel Alberto | |
dc.date.accessioned | 2017-06-13T21:41:34Z | |
dc.date.available | 2017-06-13T21:41:34Z | |
dc.date.issued | 2016-05-03 | |
dc.identifier.citation | Cabeza, M. A. (2015). Diseño de un sistema de gestión de seguridad y salud ocupacional y un sistema de gestión ambiental para reducir los costos operativos en la sub gerencia de obras de la MPT (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/10372 | es_PE |
dc.identifier.other | 670.56 CABE 2016 | es_PE |
dc.identifier.uri | https://hdl.handle.net/11537/10372 | |
dc.description.abstract | RESUMEN El presente estudio de investigación se desarrolló en base a las operaciones de la Sub Gerencia de Obras de la Municipalidad Provincial de Trujillo. Dicha Sub Gerencia, se encarga de dar cumplimiento al programa de mantenimiento de la infraestructura pública tales como pistas, veredas, sardineles, entre otros similares. En dichas actividades, las cuales pueden ser observadas a diario en las calles del distrito de Trujillo, se ha realizado un análisis del grado de cumplimiento en cuanto a la Gestión Ambiental y Gestión de Seguridad y Salud en el Trabajo. El estudio inicia, precisamente, evaluando la situación actual, identificado las deficiencias asociadas a los Sistemas de Gestión que puedan generar sobre costos para la Sub Gerencia de Obras. Una vez identificadas las deficiencias o causas de los sobrecostos, se diseñan indicadores cuantitativos que permiten estimar el sobrecosto actual. En concordancia con los objetivos planteados, se procede a realizar el diseño del Sistema de Gestión Ambiental y Sistema de Gestión de Seguridad y Salud Ocupacional, para lo cual se desarrollan las matrices IPER e IAAS, las cuales son base de los Sistemas de Gestión y permiten identificar los puntos más débiles y más necesarios a implementar. Tras el desarrollo y diseño de los Sistemas de Gestión, se proyectan los indicadores (diseñados en el capítulo anterior), obteniendo así una nueva estimación del sobrecosto. Se procede a contrastar los indicadores, obteniendo un ahorro anual del 68% con respecto a la gestión actual. Finalmente, se realiza la evaluación económica obteniendo un VAN de S/.638,556.07, una TIR anual de 232% y una relación de Beneficio/Costo de 2.02. | es_PE |
dc.description.abstract | ABSTRACT This research study was developed based on the operations of the “Sub Gerencia de Obras” of the “Municipalidad Provincial de Trujillo”. This Sub Management, is in charge of implementing the program of maintenance of public infrastructure such as roads, sidewalks, curbs, and others similar. In these activities, which can be seen daily on the streets of the district of Trujillo, it has been performed an analysis of the level of compliance in terms of Environmental Management and Management of Health and Safety at Work. The study begins precisely assessing the current situation, identified the deficiencies associated with management systems that can generate about costs for Sub Works Management. Once identified deficiencies or causes of cost overruns, quantitative indicators to estimate the current cost overrun are designed. In accordance with the objectives, the next step is to make the design Environmental Management System and Management System Occupational Safety and Health, for which the IPER and IAAS matrices are developed, which are based on management systems and allow identify the weakest and most necessary to implement points. After the development and design of management systems, indicators (designed in the previous chapter) project, thus obtaining a new estimate of the cost overrun. It proceeds to contrast the indicators, giving an annual saving of 68% compared to current management. Finally, the economic evaluation is performed to obtain a NPV of S/.638,556.07, an annual IRR of 232% and a Benefit / Cost 2.02. | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.format | application/msword | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada del Norte | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/us/ | * |
dc.source | Universidad Privada del Norte | es_PE |
dc.source | Repositorio Institucional - UPN | es_PE |
dc.subject | Gestión ambiental | es_PE |
dc.subject | Seguridad laboral | es_PE |
dc.subject | Análisis de costos | es_PE |
dc.title | Diseño de un sistema de gestión de seguridad y salud ocupacional y un sistema de gestión ambiental para reducir los costos operativos en la sub gerencia de obras de la MPT | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.grantor | Universidad Privada del Norte. Facultad de Ingeniería | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.discipline | Ingeniería Industrial | es_PE |
thesis.degree.name | Ingeniero Industrial | es_PE |
dc.publisher.country | PE | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | es_PE |
thesis.degree.program | Pregrado | es_PE |
dc.description.sede | Trujillo San Isidro | es_PE |
renati.advisor.dni | 18088425 | |
renati.author.dni | 46706442 | |
renati.discipline | 722026 | es_PE |
renati.juror | Baca Lopez, Marcos | |
renati.juror | Rodriguez Alza, Miguel | |
renati.juror | Mas McGowen, Ramiro | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Tesis [2670]