Mostrar el registro sencillo del ítem

dc.contributor.advisorArangurí Cayetano, Denis Javier
dc.contributor.authorChávez Rojas, Luis Fernando
dc.date.accessioned2017-10-30T14:11:20Z
dc.date.available2017-10-30T14:11:20Z
dc.date.issued2017-10-04
dc.identifier.citationChávez , L. F. (2017). Estudio de factibilidad técnica para la explotación minera del proyecto Millo del Consorcio Minero Horizonte S.A. distrito Oropesa, provincia Antabamba, región Apurímac, 2017 (Trabajo de investigación). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/11220.es_PE
dc.identifier.urihttps://hdl.handle.net/11537/11220
dc.description.abstractRESUMEN Con esta tesis se busca estudiar la factibilidad técnica para la explotación minera del proyecto Millo del Consorcio Minero Horizonte S.A., en el año 2017. Además, estimar el costo de capital (CAPEX), estimar el costo de Operación (OPEX) y realizar el análisis económico – financiero de dicho proyecto. El proyecto Millo perteneciente al Consorcio Minero Horizonte ubicado en el distrito de Oropesa, en la provincia de Antabamba, Departamento - Región Apurímac. El yacimiento mineral se ubica en las hojas de Chulca (30-q) y Cayarany (30-r). La investigación tiene un enfoque en lograr un funcionamiento óptimo durante la vida útil. Del mismo modo, se cumple con lograr la optimización de recursos técnicos del consorcio minero Horizonte. El costo del capital (CAPEX) del proyecto minero Millo del Consorcio Minero Horizonte S.A., se ha determinado considerando el costo del capital de mina, el costo del capital de la planta metalúrgica, costo capital de la infraestructura, costo capital en medio ambiente y costo del capital de sostenibilidad; el monto total de las inversiones requeridas por el proyecto asciende a US$ 48, 910,000. Por otro lado, el costo de Operación (OPEX), se determinado en base a dos aspectos, el primero son los costos variables de operación que comprenden el costo de operación en mina, el costo de operación de la planta metalúrgica, el costo operativo de la energía y el costo de servicios generales. El segundo comprende los costos fijos de operación. El costo total asciende a 124 $/t. Producto del análisis financiero, el VPN del proyecto es US$ 6' 943,380 y el TIR determinado es 24.15%, el cual se encuentra por encima del valor esperado en proyectos de este tipo. Se consideró necesario un préstamo de 65% de la inversión inicial, por lo cual la diferencia es el capital de trabajo necesario para iniciar el proyecto. Con dos años de inversión inicial. PALABRAS CLAVE: factibilidad técnica, explotación minera, costos, análisis económico, payback.es_PE
dc.description.abstractABSTRACT Whit thesis aims to study the technical feasibility for the mining operation of the Millo project of Consorcio Minero Horizonte SA in 2017. In addition, estimate the cost of capital (CAPEX), estimate the cost of Operation (OPEX) and perform the analysis Economic and financial aspects of this project. The Millo project belonging to Consorcio Minero Horizonte located in the district of Oropesa, in the province of Antabamba, Department - Apurímac Region. The mineral deposit is located in the leaves of Chulca (30-q) and Cayarany (30-r). Research has a focus on achieving optimal lifetime performance. In the same way, it is possible to achieve the optimization of technical resources of the Horizon mining consortium. The capital cost (CAPEX) of the Millo mining project of Consorcio Minero Horizonte SA has been determined considering the cost of the mine capital, the cost of the metallurgical plant capital, the capital cost of the infrastructure, capital cost in environment and cost of the sustainability capital; the total amount of investments required by the project amounts to US $ 48,910,000. On the other hand, the cost of Operation (OPEX), determined on the basis of two aspects, the first is the variable costs of operation that include the operating cost in the mine, the operating cost of the metallurgical plant, the operating cost of Energy and the cost of general services. The second comprises fixed operating costs. The total cost is $ 124 / t. As a result of the financial analysis, the NPV of the project is US $ 6 '943,380 and the determined IRR is 24.15%, which is above the expected value in projects of this type. A loan of 65% of the initial investment was considered necessary, so the difference is the working capital needed to start the project. With two years of initial investment. KKEYWORDS: technical feasibility, mining, costs, economic analysis, payback.es_PE
dc.description.uriTrabajo de investigaciónes_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectMineríaes_PE
dc.subjectEvaluación de proyectoses_PE
dc.subjectExcavacioneses_PE
dc.titleEstudio de factibilidad técnica para la explotación minera del proyecto Millo del consorcio Minero Horizonte S.A. distrito Oropesa, provincia Antabamba, región Apurímac, 2017es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelBachilleres_PE
thesis.degree.disciplineIngeniería de Minases_PE
thesis.degree.nameBachiller en Ingeniería de Minases_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.07.05es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeCajamarcaes_PE
renati.author.dni10314804
renati.discipline724026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#bachilleres_PE
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeInvestigaciones_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem