Mostrar el registro sencillo del ítem

dc.contributor.advisorLoja Herrera, Pedro Modesto
dc.contributor.authorJuarez Vargas, Enrique Jerson
dc.date.accessioned2017-11-15T15:57:56Z
dc.date.available2017-11-15T15:57:56Z
dc.date.issued2017-09-03
dc.identifier.citationJuarez, E. J. (2016). Diseño e instalación de un grupo electrógeno a gas natural de 2000 KW en la planta Santa Clara de la empresa Kimberly Clark para disminuir los costos en consumo de energía eléctrica (Trabajo de suficiencia profesional). Recuperado de http://hdl.handle.net/11537/11395es_PE
dc.identifier.other670.42 JUAR 2016es_PE
dc.identifier.urihttps://hdl.handle.net/11537/11395
dc.description.abstractRESUMEN Actualmente todas las empresas, sin excepción, buscan la manera de disminuir sus costos operativos, uno de los puntos clave para este fin es buscar fuentes de energía alternativas y confiables. En la mayoría de procesos productivos, por no decir todos, la energía eléctrica es la fuente de energía que está presente de manera directa o indirecta para el funcionamiento de maquinarias y equipos, sea cual fuese el origen de la industria. Por consiguiente, tener una fuente de energía alternativa se ha convertido en uno de los objetivos principales de las empresas, siendo Kimberly Clark una de estas empresas. Entonces surge la interrogante ¿de qué manera podemos mejorar los costos de la energía eléctrica? Dentro de las alternativas con las que contamos actualmente, tenemos los grupos electrógenos que funcionan con motores de combustión interna con combustibles alternativos gaseosos, siendo estos altamente solicitados por su actual disponibilidad, precio y que son menos contaminantes que los combustibles líquidos, de los que se cuentan, el Gas Natural, GLP, Gas de digestor, por mencionar algunos. Teniendo esta necesidad, la empresa Kimberly Clark optó por la adquisición de un grupo electrógeno de 2000kW a Gas Natural de la marca “Cummins Power Generation”. La intención del presente trabajo es brindar los lineamientos fundamentales para la instalación de un Grupo Electrógeno basados en las recomendaciones del fabricante y bajo la normativa legal del país para que el equipo pueda operar de manera óptima en la puesta en servicio y durante toda su vida útil. Todas las etapas del proyecto son: Diseño, Instalación, Pre-Comisionamiento, Comisionamiento, Puesta en Marcha, Operación y Mantenimiento. En este trabajo solo se detallará la etapa de Diseño de Instalación. Finalmente, se pudo determinar que el costo operativo de generar electricidad con un Grupo Electrógeno a Gas Natural es más barato que consumir del concesionario local.es_PE
dc.description.abstractABSTRACT Currently all companies, without exception, are looking for ways to reduce their operating costs, one of the key points for this purpose is to look for alternative and reliable sources of energy. In most production processes, not to mention all, electric energy is the source of energy that is present directly or indirectly for the operation of machinery and equipment, whatever the origin of the industry. Therefore, having an alternative energy source has become one of the main objectives of the companies, being Kimberly Clark one of these companies. Then the question arises: how can we improve the costs of electricity? Among the alternatives, we currently have, we have the generators that run on internal combustion engines with gaseous alternative fuels, which are highly requested for their current availability, price and are less polluting than liquid fuels, which are Natural Gas, LPG, Digester Gas, to mention a few. Having this need, the Kimberly Clark Company opted for the acquisition of a 2000kW generator set to Gas Natural of the "Cummins Power Generation" brand. The intention of the present work is to provide the fundamental guidelines for the installation of a Generator Set based on the manufacturer's recommendations and under the legal regulations of the country so that the equipment can operate in an optimal way in the commissioning and throughout its useful life. All stages of the project are: Design, Installation, Pre-Commissioning, Commissioning, Commissioning, Operation and Maintenance. In this work, only the stage of Installation Design will be detailed. Finally, it was possible to determine that the operating cost of generating electricity with a Natural Gas Generating Group is cheaper than consuming from the local concessionaire.es_PE
dc.description.uriTrabajo de suficiencia profesionales_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectAdministración de operacioneses_PE
dc.subjectAdministración de procesoses_PE
dc.subjectAdministración industriales_PE
dc.subjectGas naturales_PE
dc.titleDiseño e instalación de un grupo electrógeno a gas natural de 2000 KW en la planta Santa Clara de la empresa Kimberly Clark para disminuir los costos en consumo de energía eléctricaes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeLos Olivoses_PE
renati.advisor.dni08808891
renati.author.dni40722262
renati.discipline722026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesionales_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem