Show simple item record

dc.contributor.advisorBaca López, Marcos Gregorio
dc.contributor.authorVillar Zapata, Carlos Eduardo
dc.date.accessioned2017-12-08T00:15:12Z
dc.date.available2017-12-08T00:15:12Z
dc.date.issued2016-10-07
dc.identifier.citationVillar, C. E. (2016). Mejora continua utilizando manufactura esbelta en el tendido de cableado eléctrico para aumentar la productividad de la empresa Gym en un proyecto minero en la ciudad de Arequipa, 2016 (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/12570es_PE
dc.identifier.other670.5 VILL 2016es_PE
dc.identifier.urihttps://hdl.handle.net/11537/12570
dc.description.abstractRESUMEN En los últimos años, se han venido presentando numerosos proyectos de gran envergadura, por lo que las exigencias en la construcción han aumentado considerablemente. Las empresas constructoras se proyectan ahora en entregar proyectos en el menor tiempo posible, ofreciendo un producto basado en los estándares de calidad. Cada proyecto de construcción abarca distintas actividades, entre ellas el montaje de estructuras, montaje de tuberías (piping), instalación y conexionado de equipos, soldadura, actividades mecánicas y eléctricas, entre otras. Una de las actividades que representa una parte importante de la obra realizada en este proyecto, es el cableado eléctrico. Esta actividad es pieza clave de la construcción, debido a que requiere de un gran esfuerzo y equipo de trabajo dedicado a realizar dicha obra. Muchas veces presenta problemas de operación y la obra debe ser retrasada en entrega debido a algún error en su ejecución. En la presente investigación se propone la implementación de la metodología de Manufactura Esbelta en la actividad de cableado eléctrico, ya que generaría un aumento de productividad a un 78% y una disminución de tiempos de espera, sea por falta de materiales o búsqueda de herramientas a un 20%, comprobando así que la Manufactura Esbelta es una herramienta multifacética y adaptable a diversas realidades.es_PE
dc.description.abstractABSTRACT In the last years, they have come presenting various projects of great importance, requirements in construction have increased considerably. Construction companies are projected now in delivering projects in the minor possible time, offering a product based on the qualit standards. Every project of construction includes different activities, between them the assembly of structures, assembly of pipelines (piping), installation and hookup of equipments, weld, mechanical and electrical activities like others. One of the activities that represents an important part of the work realized in this project, is wired up electrically. This activity is a key part of the construction, due to the fact that it needs a great effort and equipment of work dedicated to realizing the above mentioned work. Often it presents problems of operation and the work must be been late in delivery due to some mistake in his execution. In the present investigation one proposes the implementation of the methodology of Slender Manufacture in the activity of wired up electrically, since it would generate an increase of productivity to 78 % and a decrease of times of wait, be for lack of materials or search of tools to 20 %, verifying so the Slender Manufacture is a many-sided and adaptable tool to diverse realities.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de Américaes_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectAdministración de la producciónes_PE
dc.subjectIngeniería Industriales_PE
dc.subjectAdministración de procesoses_PE
dc.subjectProcesos industrialeses_PE
dc.subjectProductividad( motivación)es_PE
dc.titleMejora continua utilizando manufactura esbelta en el tendido de cableado eléctrico para aumentar la productividad de la empresa Gym en un proyecto minero en la ciudad de Arequipa, 2016es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeTrujillo San Isidroes_PE
renati.advisor.dni17805248
renati.author.dni70610266
renati.discipline722026es_PE
renati.jurorBaca López, Marcos
renati.jurorGarcía González, Jorge
renati.jurorMas McGowen, Ramiro
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Files in this item

Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess