Mostrar el registro sencillo del ítem

dc.contributor.advisorCastillo Cabrera, Rafael
dc.contributor.authorArmas Viteri, Daniel Ignacio de Jesús
dc.contributor.authorFernández Gutiérrez, Gladys Edith
dc.date.accessioned2018-04-23T17:13:11Z
dc.date.available2018-04-23T17:13:11Z
dc.date.issued2017-02-15
dc.identifier.citationArmas, D. I., & Fernández, G. E. (2017) Propuesta de un sistema integrado de producción y logística para reducir los costos operativos en la línea de fabricación de buses sobre chasis modelo MB LO 915 de la empresa factoría Bruce S. A [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. Recuperado de https://hdl.handle.net/11537/13207es_PE
dc.identifier.other670.5 ARMA 2017es_PE
dc.identifier.urihttps://hdl.handle.net/11537/13207
dc.description.abstractEl presente trabajo tuvo como objetivo general reducir los costos operativos en la línea de fabricación de buses sobre chasis modelo MB LO 915 de la empresa Factoría Bruce S.A. mediante la propuesta de un sistema integrado de producción y logística. Para lo cual, en primera estancia se ha descrito el estado actual de las áreas de producción y logística de la empresa Factoría Bruce S.A., de esta manera nos permitió plantear el desarrollo de una propuesta de mejora para la reducción de los costos operativos por medio de la aplicación de herramientas logísticas como la clasificación de materiales por el método ABC, punto de reorden y lote óptimo de pedido; que a su vez complementan el plan de requerimientos de material (MRP) propuesto. Los resultados que se lograron son: · Se logró aumentar la cantidad de unidades entregadas dentro del plazo en un 54.38%. · Se logró reducir el costo promedio de los reprocesos por unidad en un 74.9%. · Se logró reducir la cantidad de compras a proveedores secundarios en un 73.76% y el costo de esas compras en un 76.17% El impacto en los costos operativos al finalizar el quinto año de la implementación de la propuesta de mejora es de una reducción de S/. 41.009.es_PE
dc.description.abstractThe following investigation project main objective was to reduce operating costs in the coachwork for buses on chassis MB LO 915 manufacturing line of the Factoria Bruce S.A. company, by proposing an integrated production and logistics system. For that, first, we described the current state of the production and logistics areas, which allowed us to pose the development of an improvement proposal for the reduction of operating costs through the application of logistics tools such as the ABC method for materials classification, the reorder point and the economic order quantity, which complement the proposed material requirements planning (MRP). The achieved results are: · The number of buses delivered within the time limit were increased in a 54.38%. · The average cost of reprocessing per unit was reduced in a 74.9% · The amount of purchases to secondary suppliers were reduced in a 73.76% and the average cost of this purchases was reduced in a 76.17%. The impact on the operating costs at the end of the fifth year of the implementation of the improvement proposal is an S/. 41,009 reduction.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de Américaes_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectLogísticaes_PE
dc.subjectControl de inventarioes_PE
dc.subjectAutomatización de la producciónes_PE
dc.titlePropuesta de un sistema integrado de producción y logística para reducir los costos operativos en la línea de fabricación de buses sobre chasis modelo MB LO 915 de la empresa factoría Bruce S. Aes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeTrujillo San Isidroes_PE
renati.advisor.dni45236444
renati.advisor.orcidhttps://orcid.org/0000-0001-6804-5852es_PE
renati.author.dni73382500
renati.author.dni47806301
renati.discipline722026es_PE
renati.jurorBaca López, Marco
renati.jurorMás McGowen, Ramiro
renati.jurorRodríguez Alza, Miguel Ángel
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess