Mostrar el registro sencillo del ítem

dc.contributor.advisorVilchez Torres, Mylena Karen
dc.contributor.authorCastro Pérez, Daniel Julio
dc.date.accessioned2018-06-16T02:46:01Z
dc.date.available2018-06-16T02:46:01Z
dc.date.issued2018-05-25
dc.identifier.citationCastro, D. J. (2018). Aplicación del método de estudio de tiempos para actualizar el tiempo estándar de perforación en la fase de extracción Minera Arcata (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/13445es_PE
dc.identifier.otherTES 670.42 CAST/T 2018es_PE
dc.identifier.urihttps://hdl.handle.net/11537/13445
dc.description.abstractRESUMEN El presente trabajo de investigación tiene por título “Aplicación del Método de Estudio de Tiempos para actualizar el Tiempo Estándar de perforación en la fase de extracción Minera Arcata” en la empresa se tiene un deficiencia en la actualización del tiempo estándar en perforación debido al cambio de método de trabajo en los últimos años, cuyo propósito principal es actualizar el tiempo estándar de perforación en el método convencional realce mediante la aplicación del estudio de tiempos en la fase de extracción de la Minera Arcata. La determinación de resultados fue realizada a través de la entrevista, revisión de documentos y observación para el registro de datos, donde se analizó la información obtenida para la elaboración de las conclusiones finales de la investigación, finalmente se determinó que el tiempo estándar de perforación en el método convencional realce. El presente estudio da a conocer el detalle del trabajo de observación en campo por parte del equipo de productividad Arcata, realizado en cada uno de los tajos seleccionados para el estudio, durante el desarrollo de cada una de las actividades del ciclo de minado en los turnos de día y noche., obtenido mediante la aplicación del estudio de tiempos en la fase de extracción de la Mina Arcata es de 211.95 minutos/malla así mismo se recomienda realizar la aplicación del método de estudio de tiempos en un tiempo no mayor a 4 años para mantener un reconocimiento constantes de las actividades que pueden ser aparecer en la actividad de perforación.es_PE
dc.description.abstractABSTRACT The present research work is entitled "Application of the Time Study Method to update the Standard Time of drilling in the mining phase Arcata Mine" in the company has a deficiency in the updating of the standard time in drilling due to the change of method of work in recent years, whose main purpose is to update the standard time of drilling in the conventional method enhanced by applying the study of times in the extraction phase of the Minera Arcata. The determination of results was carried out through the interview, review of documents and observation for data recording, where the information obtained was analyzed for the preparation of the final conclusions of the investigation, finally it was determined that the standard time of drilling in the conventional method enhances. The present study reveals the detail of the observation work in the field by the Arcata productivity team, carried out in each of the pits selected for the study, during the development of each one of the activities of the mining cycle in the shifts day and night., obtained by applying the study of times in the extraction phase of the Arcata Mine is 211.95 minutes / mesh is also recommended to perform the application of the method of time study in a time not exceeding 4 years to maintain a constant recognition of the activities that may appear in the drilling activity.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectEstudio de tiempoes_PE
dc.subjectMinería subterráneaes_PE
dc.subjectTécnica de excavaciónes_PE
dc.titleAplicación del método de estudio de tiempos para actualizar el tiempo estándar de perforación en la fase de extracción Minera Arcataes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeCajamarcaes_PE
renati.discipline722026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem