Mostrar el registro sencillo del ítem

dc.contributor.advisorVereau Miranda, Edmundo
dc.contributor.authorGerundas Asto, Jose Enrique
dc.contributor.authorPaucar Romero, Bryan Jesus
dc.date.accessioned2023-12-12T21:19:07Z
dc.date.available2023-12-12T21:19:07Z
dc.date.issued2023-08-01
dc.identifier.citationGerundas, J. E., & Paucar, B. J. (2023). Análisis comparativo de tiempo, precisión y costo entre un levantamiento topográfico con RPA y estación total en el complejo deportivo Venezuela de Ayacucho, provincia Huamanga [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/35354es_PE
dc.identifier.other624.0287 GERU 2023es_PE
dc.identifier.urihttps://hdl.handle.net/11537/35354
dc.description.abstractEn la actualidad la topografía ha tenido evoluciones significativas, con técnicas e instrumentos que permiten realizar mediciones directas o indirectas de la superficie terrestre, de una manera más rápida y obteniendo resultados cada vez más precisos y confiables. El objetivo de la investigación fue evaluar la diferencia de tiempo, precisión y costo de dos métodos directos de levantamientos topográficos con el método RPA y la estación total. El trabajo de campo se realizó mediante la recolección de datos, los cuales fueron procesados con el software pix4d mapper, donde se obtuvo la nube de puntos, ortofoto, modelo digital de elevación y superficie con curvas de nivel. Posterior a ello, se procesó la información obtenida anteriormente con el uso del software AutoCAD Civil 3d para la obtención de los puntos y su comparación. El trabajo de investigación fue de tipo aplicada por el hecho que se centra a encontrar mecanismos para la obtención de datos cuantitativos y poder comprarlos. La muestra es en el complejo deportivo Venezuela de Ayacucho de 7.5 Has. Como resultados, se evidenció que el levantamiento topográfico con RPA tuvo una tolerancia menor a -0.066 m respecto a la estación total. Además, presentó una mejor factibilidad económica en un 11.98% respecto a la estación total, con respecto al tiempo, se determinó una disminución en el cronograma de ejecución de hasta un 60% respecto al levantamiento con estación total. Se concluye que el método de levantamiento topográfico con RPA tiene una precisión aceptable para este tipo de levantamientos, el costo obtenido resultó ser menor y el tiempo fue menor respecto al levantamiento topográfico con estación total.es_PE
dc.description.abstractCurrently, topography has undergone significant developments, with techniques and instruments that allow direct or indirect measurements of the earth's surface to be made more quickly and obtaining increasingly accurate and reliable results. The objective of the research was to evaluate the difference in time, precision and cost of two direct methods of topographic surveys with the RPA method and the total station. The field work was carried out by collecting data, which were processed with the pix4d mapper software, where the point cloud, orthophoto, digital elevation model and surface with contour lines were obtained. After that, the information previously obtained with the use of AutoCAD Civil 3d software was processed to obtain the points and their comparison. The research work was of an applied type due to the fact that it focuses on finding mechanisms to obtain quantitative data and to be able to buy them. The sample is in the Venezuela de Ayacucho sports complex of 7.5 Has. As results, it was evidenced that the topographic survey with RPA had a tolerance of less than -0.066 m with respect to the total station. In addition, it presented a better economic feasibility by 11.98% compared to the total station, with respect to time, a decrease in the execution schedule of up to 60% was determined compared to the total station survey. It is concluded that the topographic survey method with RPA has an acceptable precision for this type of survey, the cost obtained was lower and the time was shorter compared to the topographic survey with total station.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectTopografíaes_PE
dc.subjectTopografía mineraes_PE
dc.subjectTiempoes_PE
dc.subjectPrecisiónes_PE
dc.subjectCostoes_PE
dc.subjectEstación totales_PE
dc.subjectRPAes_PE
dc.subjectTimees_PE
dc.subjectPrecisiones_PE
dc.subjectCostes_PE
dc.subjectTotal stationes_PE
dc.titleAnálisis comparativo de tiempo, precisión y costo entre un levantamiento topográfico con RPA y estación total en el complejo deportivo Venezuela de Ayacucho, provincia Huamangaes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Civiles_PE
thesis.degree.nameIngeniero Civiles_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeBreñaes_PE
renati.advisor.dni10557797
renati.advisor.orcidhttps://orcid.org/0000-0003-1984-1734es_PE
renati.author.dni73528844
renati.author.dni76373053
renati.discipline732016es_PE
renati.jurorNeyra Torres, Jose Luis
renati.jurorRabanal Chavez, Erick Humberto
renati.jurorCampos Vasquez, Neicer
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
dc.relation.conformsto18%es_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess