Mostrar el registro sencillo del ítem

dc.contributor.advisorLujan López, Jorge Eduardo
dc.contributor.authorCaceres Gallegos, Karen Cynthia
dc.date.accessioned2024-03-13T16:46:59Z
dc.date.available2024-03-13T16:46:59Z
dc.date.issued2023-10-09
dc.identifier.citationCaceres, K. C. (2023). Gestión de riesgos en los proyectos de energía de una empresa distribuidora de grupos electrógenos a través de un plan de repuesta bajo la guía del PMBOK [Tesis de maestría, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/36117es_PE
dc.identifier.other658.155 CACE 2023es_PE
dc.identifier.urihttps://hdl.handle.net/11537/36117
dc.description.abstractLa presente investigación abordó la gestión de riesgos en un proyecto de respaldo de energía de una empresa distribuidora de grupos electrógenos, siguiendo las praxis recomendadas en la Guía del PMBOK, 7° Edición, a fin de determinar el impacto de la implementación de un Plan de Respuesta a los Riesgos. El proyecto se encuentra ubicado en el distrito de Arequipa (Centro), provincia de Arequipa, departamento de Arequipa. Con el propósito de abordar un planteamiento específico, a través de un enfoque explicativo y diseño pre-experimental, se buscó una gestión adecuada de los riesgos por medio de actividades incluidas en la propuesta metodológica durante un período de diez meses, desde septiembre de 2021 hasta julio de 2022. Se desarrolló un Plan de Gestión de Riesgos que estableció la metodología y las directrices para cada subproceso de la gestión de riesgos. Se identificaron 48 riesgos, de los cuales 19 fueron priorizados como " altos" a través del análisis cualitativo. El Valor Monetario Esperado (VME) obtenido mediante el análisis cuantitativo fue de $71,395, lo que implica un impacto negativo en el proyecto debido a una gestión inadecuada de riesgos. Se estimó un costo de inversión de $19,800 para poner en marcha del Plan de Respuesta, y se logró una eficiente implementación que redujo los costos de las actividades preventivas planificadas en un 49.49%, lo que representó un ahorro de $9,800 en el margen del proyecto. Durante la etapa de ejecución, se materializaron 10 riesgos que fueron gestionados de acuerdo con el Plan de Contingencia; el costo real de las actividades correctivas fue de $5200. En cuanto al costo beneficio, cada dólar invertido en llevar a cabo el Plan de Respuesta generó una reducción de $4.04 en los impactos asociados a una gestión deficiente de riesgos. Además, el margen final del proyecto aumentó del 10% al 10.62% en comparación con lo planificado, reflejando los resultados obtenidos en el desarrollo del proyecto.es_PE
dc.description.abstractThe present investigation addressed risk management in the energy backup project of a generator set trading company, following the good practices of the PMBOK Guide, 7th Edition, to determine the impact of implementing a Risk Response Plan. The project is located in the Arequipa district (Centro), Arequipa province, Arequipa department. Through an applied research methodology, with an explanatory approach and a pre-experimental research design, efficient risk management was sought. The research proposes deploying activities related to the proposed methodology, such as planning, identification, qualitative analysis, quantitative analysis, response planning, and risk monitoring, over a period of ten months, from September 2021 to July 2022. A Risk Management Plan was developed that established the methodology and guidelines for each sub-process of risk management. Forty-eight risks were identified, of which nineteen were prioritized as " high" through qualitative analysis. The Expected Monetary Value (EMV) obtained through quantitative analysis was $71,395, implying a negative impact on the project due to inadequate risk management. An investment cost of $19,800 was estimated for the implementation of the Risk Response Plan, and an efficient implementation was achieved, reducing the costs of planned preventive activities by 49.49%, resulting in a saving of $9,800 in the project's margin. During the execution stage, ten risks materialized and were managed according to the Contingency Plan, with the actual cost of corrective activities amounting to $5,200. In terms of cost-benefit, each dollar invested in the implementation of the Risk Response Plan generated a reduction of $4.04 in the impacts associated with poor risk management. Additionally, the project's final margin increased from 10% to 10.62% compared to the planned value, reflecting the results obtained in the project's development.es_PE
dc.description.uriTesis
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de América*
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectGestión del riesgoes_PE
dc.subjectAdministración del riesgoes_PE
dc.subjectIndustria energéticaes_PE
dc.subjectGuía del PMBOKes_PE
dc.subjectRisk managementes_PE
dc.subjectPMBOK Guidees_PE
dc.titleGestión de riesgos en los proyectos de energía de una empresa distribuidora de grupos electrógenos a través de un plan de repuesta bajo la guía del PMBOKes_PE
dc.typeinfo:eu-repo/semantics/masterThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Escuela de Posgrado y Estudios Continuoses_PE
thesis.degree.levelMaestroes_PE
thesis.degree.disciplineMaestría en Dirección de Operaciones y Cadena de Abastecimientoes_PE
thesis.degree.nameMaestro en Dirección de Operaciones y Cadena de Abastecimientoes_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPosgradoes_PE
dc.description.sedeTrujillo El Molinoes_PE
renati.advisor.dni17897692
renati.advisor.orcidhttps://orcid.org/0000-0003-1208-1242es_PE
renati.author.dni70341246
renati.discipline722117es_PE
renati.jurorMendoza de Los Santos, Alberto Carlos
renati.jurorParedes Vargas, Ronal Santos
renati.jurorCalizaya Portal, Jorge Guillermo
renati.levelhttp://purl.org/pe-repo/renati/level#maestroes_PE
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
dc.relation.conformsto19%es_PE
dc.description.lineadeinvestigacionDesarrollo sostenible y gestión empresariales_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess