Mostrar el registro sencillo del ítem

dc.contributor.advisorQuispe Vásquez, Luis Roberto
dc.contributor.authorAmambal Alaya, Fernando
dc.contributor.authorHuatay Caja, Carlos Víctor
dc.date.accessioned2018-12-13T21:49:30Z
dc.date.available2018-12-13T21:49:30Z
dc.date.issued2018-10-15
dc.identifier.citationAmambal, F., & Huatay, C. V. (2018). Diseño de un plan de gestión de mantenimiento para mejorar la disponibilidad mecánica de la maquinaria pesada en la empresa Martinez Contratistas e Ingeniería S.A. - Arequipa, 2018 (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/14562es_PE
dc.identifier.other670.42 AMAM 2018es_PE
dc.identifier.urihttps://hdl.handle.net/11537/14562
dc.description.abstractRESUMEN La presente investigación es de tipo descriptiva analítica, que presenta su problema en el área de mantenimiento mecánico debido a las constantes paradas no programadas por fallas imprevistas de la maquinaria pesada de la Empresa Martínez Contratistas E Ingeniería S.A; por lo que se tuvo como principal objetivo diseñar un plan de gestión de mantenimiento para mejorar la disponibilidad mecánica de la maquinaria pesada, mediante cambios técnicos y operativos que podrán disminuir las paradas no programadas, mejorando el proceso de producción en general. Luego de analizar y evaluar la situación de la deficiencia de la disponibilidad de los equipos, se presentó el diseño de un plan de gestión de mantenimiento para mejorar la disponibilidad mecánica, la cual se encuentra en promedio general en un 86.97%; se espera que con la posible aplicación del diseño de un plan de gestión de mantenimiento la disponibilidad mecánica mejorara en un 92%, dicho diseño de un plan de gestión de mantenimiento es elaborado en base a las oportunidades de mejora del área de mantenimiento de la Empresa Martínez Contratistas E Ingeniería S.A., De la misma manera se hizo la valoración económica del plan de gestión de mantenimiento la cual asciende a un costo de $. 618, 375.58 en repuestos, mas $. 615,360.00 que se dejaría de percibir por las paradas en la posible ejecución del nuevo plan de mantenimiento correctivo, ya que al no contar con este diseño la empresa habría perdió $ 2, 933,800.00 en el año 2017 en horas/maquina. Se llegó a la conclusión de proponer el diseño de un plan de gestión de mantenimiento para mejorar la disponibilidad mecánica, así mismo reducir las constantes paradas no programas y de esta manera aumentar la rentabilidad de la empresa. PALABRAS CLAVE: Gestión de mantenimiento, baja disponibilidad mecánica, utilización de la máquina, puntos críticos, diseño de mantenimiento.es_PE
dc.description.abstractABSTRACT The present investigation is of descriptive analytical type, that presents its problem in the area of mechanical maintenance due to the constant unscheduled stops for unexpected failures of the heavy machinery of the Company Martínez Contratistas E Ingeniería S.A; therefore, the main objective was to design a maintenance management plan to improve the mechanical availability of heavy machinery, through technical and operational changes that may reduce unscheduled downtime, improving the overall production process. After analyzing and evaluating the situation of the deficiency of equipment availability, the design of a maintenance management plan was presented to improve mechanical availability, which is in general average at 86.97%; it is expected that with the possible application of the design of a maintenance management plan the mechanical availability will improve by 92%, said design of a maintenance management plan is elaborated based on the improvement opportunities of the maintenance area of the Company Martínez Contratistas E Ingeniería SA, In the same way, the economic evaluation of the maintenance management plan was made, which amounts to a cost of $. 618, 375.58 in spare parts, plus $. 615,360.00 That would not be received due to the stops in the possible execution of the new corrective maintenance plan, since by not having this design the company would have lost $ 2,933,800.00 in 2017 in hours / machine. It was concluded to propose the design of a maintenance management plan to improve the mechanical availability, as well as reduce the constant stops no programs and in this way increase the profitability of the company. KEYWORDS: Maintenance management, low mechanical availability, use of the machine, critical points, maintenance design.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectMantenimientoes_PE
dc.subjectMaquinariases_PE
dc.subjectIngeniería industriales_PE
dc.titleDiseño de un plan de gestión de mantenimiento para mejorar la disponibilidad mecánica de la maquinaria pesada en la empresa Martinez Contratistas e Ingeniería S.A. - Arequipa, 2018es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeCajamarcaes_PE
renati.discipline722026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem