• español
    • English
View Item 
  •   DSpace Home
  • Facultad de Ingeniería
  • Ingeniería Civil
  • Tesis
  • View Item
  •   DSpace Home
  • Facultad de Ingeniería
  • Ingeniería Civil
  • Tesis
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Aplicación de carta balance para mejorar la productividad en obras de edificaciones de ductilidad limitada en el distrito de Bellavista, provincia del Callao, 2021

Thumbnail
View/Open
Descargar
(application/pdf: 403.2Kb)
Descargar
(application/pdf: 5.097Mb)
Embargado
(application/vnd.openxmlformats-officedocument.wordprocessingml.document: 5.388Mb)
Embargado hasta el 01/01/2090
Embargado
(application/pdf: 178.8Kb)
Embargado hasta el 01/01/2090
Date
2021-01-14
Author(s)
Yturbe Payano, Nathaly Nicole
Metadata
Show full item record
Abstract
La presente investigación tuvo como finalidad el determinar mediante la aplicación de Carta Balance, la mejora de la productividad en obras de edificaciones de ductilidad limitada en el Distrito de Bellavista. En primera instancia, se identificaron las obras de edificaciones de ductilidad limitada activas en el distrito y se determinó que eran 03. Una vez identificadas las obras en las que se aplicarían el estudio, se procedió a visitar las instalaciones y posterior a esto, aplicar el instrumento de medición “lista de chequeo” (de autoría propia) que demostró la deficiencia del control de la productividad de la mano de obra. Seguidamente, se obtuvieron los Informes Semanales de Productividad (ISP) elaborados por las empresas constructoras y mediante la información registrada en los informes, se identificaron las actividades con bajos niveles de productividad; en el caso del Proyecto 01 fue “Habilitación de acero”, en el caso del Proyecto 02 fue “Encofrados” y en el caso del Proyecto 03 fue “Solaqueos”. Ya con las actividades identificadas, se realizó el muestreo mediante observación directa a las cuadrillas de trabajo encargadas de la ejecución de las actividades mencionadas y esta información fue, posteriormente, registrada en las Cartas Balance utilizadas para el estudio. Posteriormente, se realizó el procesamiento de resultados de las Cartas Balance encontrándose niveles bajos de trabajo productivo en las tres actividades. Una vez identificadas las posibles causas del bajo nivel de este indicador, se aplicaron las medidas correctivas correspondientes. Finalmente, se realizó una segunda evaluación de la productividad mediante Cartas Balance en las 03 obras lográndose una mejora de los porcentajes de trabajo productivo en cada actividad igual a 29% en “Habilitación de acero”, 16% en “Encofrados y 36% en Solaqueos. A través de estos resultados, se ratificó y demostró la mejora de la productividad a través de la aplicación de esta herramienta. Asimismo, mejoraron la eficiencia de la mano de obra y los índices de ratios de productividad.
Mostrar más
 
The purpose of this research was to determine, through the application of Carta Balance, the improvement of productivity in construction works of limited ductility in the Bellavista District. In the first instance, the works of buildings of limited ductility active in the district were identified and it was determined that they were 03. Once the works in which the study would be applied had been identified, the facilities were visited and after that, the “checklist” measurement instrument (self-authored) that demonstrated the deficiency in the control of labor productivity. Next, the Weekly Productivity Reports (ISP) prepared by the construction companies were obtained and through the information recorded in the reports, the activities with low productivity levels were identified; in the case of Project 01 it was “Steel Fitting”, in the case of Project 02 it was “Formwork” and in the case of Project 03 it was “Flooring”. With the activities identified, the sampling was carried out through direct observation of the work crews in charge of the execution of the aforementioned activities and this information was later recorded in the Balance Letters used for the study. Subsequently, the results of the Balance Letters were processed, finding low levels of productive work in the three activities. Once the possible causes of the low level of this indicator were identified, the corresponding corrective measures were applied. Finally, a second evaluation of productivity was carried out through Balance Letters in the 03 works, achieving an improvement in the percentages of productive work in each activity equal to 29% in "Steel Fitting", 16% in "Formwork and 36% in Solaqueos. . Through these results, the improvement in productivity through the application of this tool was ratified and demonstrated. Likewise, labor efficiency and productivity ratio indices improved.
Mostrar más
 
URI
https://hdl.handle.net/11537/29253
Bibliographic citation
Yturbe, N. N. (2021). Aplicación de carta balance para mejorar la productividad en obras de edificaciones de ductilidad limitada en el distrito de Bellavista, provincia del Callao, 2021 [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/29253
Subject
Edificaciones
Construcción
Productividad del trabajo
Carta balance
Balance sheet
Collections
  • Tesis [1815]

Related items

Showing items related by title, author, creator and subject.

  • Thumbnail

    Mejora de la productividad en las partidas de colocación de acero y encofrado de reservorio e instalación de tuberías aplicando la carta balance en Ñaña y anexos, distrito de Lurigancho-Chosica. 2019 

    Tiburcio Huerta, Pedro Edgardo; Nolasco Gonzales, Jesús William (Universidad Privada del Norte, 2019-05-11)
    Embargado
    La presente investigación titulada: “Mejora de la productividad en las partidas de colocación de acero y encofrado de reservorio e instalación de tubería aplicando la carta balance en Ñaña y anexos, Distrito de Lurigancho ...
  • Thumbnail

    Mejora de la productividad en las partidas de falso cielo raso de superboard e instalación de ventanas de cristal templado mediante el uso de las herramientas de la filosofía lean construction en la obra construcción del hospital II-1 nuestra Señora del Rosario de Cajabamba – Cajamarca – 2017 

    Valle Rojas, Justo Moisés; Ibáñez Vega, Robert (Universidad Privada del Norte, 2017-09-10)
    Acceso abierto
    RESUMEN El presente trabajo de investigación cuasi experimental, tuvo por objetivo mejorar la productividad en las partidas de Falso Cielo Raso de Superboard e Instalación de Ventanas de Cristal Templado mediante el uso ...
  • Thumbnail

    Diagnóstico y propuesta de mejora de la productividad a nivel cimentaciones en la IE Andrés Avelino Cáceres, Trujillo - 2021 

    Villacorta Esteves, Elmo Alberto; Villacorta Varas, Juver Javier (Universidad Privada del Norte, 2022-01-31)
    Acceso abierto
    El presente trabajo de investigación cuasi experimental, tuvo por objetivo diagnosticas y realizar una propuesta para mejorar la productividad a nivel de cimentación en la Obra, “Mejoramiento del Servicio de Educación ...

Contacto:  [email protected]

  • Estadísticas
  • English 
    • español
    • English
  • Login

Todos los derechos reservados.
 

 

Documentos
Política del Repositorio Institucional UPNProtocolo para el depósito de datos y publicaciones de investigaciones científicas en el Repositorio Institucional

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsAdvisorsTitlesSubjectsVenuesTypes of researchThis CollectionBy Issue DateAuthorsAdvisorsTitlesSubjectsVenuesTypes of research

Contacto:  [email protected]

  • Estadísticas
  • English 
    • español
    • English
  • Login

Todos los derechos reservados.