Show simple item record

dc.contributor.advisorBautista Zuñiga, Lucia Maribel
dc.contributor.authorGiuttari Claussi, Angello Santiago
dc.date.accessioned2022-03-09T19:56:51Z
dc.date.available2022-03-09T19:56:51Z
dc.date.issued2021-12-06
dc.identifier.citationGiuttari, A. S. (2021). Diseño y distribución de planta para mejorar la productividad del proceso de fabricación de estructuras metálicas en una empresa metalmecánica [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/29629es_PE
dc.identifier.other658.314 GIUT 2021es_PE
dc.identifier.urihttps://hdl.handle.net/11537/29629
dc.description.abstractEl presente trabajo de investigación tuvo como objetivo diseñar y distribuir la planta para mejorar la productividad de procesos de fabricación de estructuras metálicas en una empresa metalmecánica. La investigación es de tipo aplicado, con diseño pre experimental. Como resultado se logró una reducción en los metros recorridos por los operadores entre las distintas áreas en el taller de producción de 1981.39 metros los cuales fueron tomados inicialmente a 1256.71 correspondientes a la etapa posterior a la implementación de las herramientas, lo cual representa una variación de 36.6%. En lo que respecta al espacio utilizado en el taller de producción de 311.23 metros cuadrados los cuales fueron tomados inicialmente a 286.71 correspondientes a la etapa posterior a la implementación de las herramientas, ello representa una variación a la mejora de 7.9% y también, la mejora en la utilización de la mano de obra en el taller, reduciendo así la cantidad de 11 trabajadores interactuando en la fabricación de las estructuras, a una cantidad de 9 trabajadores, esto representa una variación del 18.18%. Como consecuencia de la implementación de las mejoras a través de las herramientas, se logró incrementar la Productividad total del taller de fabricación de 69.1% obtenidas en la etapa de Pre Test a una productividad mejorada de 81.2%. Finalmente, se llevó a cabo el análisis de flujo de caja, donde se pudo conocer el indicador del estado más probable con un VAN de S/136,515.87, el TIR de 147% y un IR de S/. 7.01. Con estos resultados se puede concluir que el proyecto es factible.es_PE
dc.description.abstractThe objective of this instigation work was to design and distribute the plant to improve the productivity of metal structure manufacturing processes in a metalworking company. The research is of an applied type, with a pre-experimental design. As a result, a reduction was achieved in the meters traveled by the operators between the different areas in the 1981 production workshop, 39 meters which were initially taken at 1256.71 corresponding to the stage after the implementation of the tools, which represents a variation of 36.6%. Regarding the space used in the production workshop of 311.23 square meters which were initially taken to 286.71 corresponding to the stage after the implementation of the tools, this represents a variation to the improvement of 7.9% and also, the improvement in the use of labor in the workshop, thus reducing the number of 11 workers interacting in the manufacture of structures, to a number of 9 workers, this represents a variation of 18.18%. As a consequence of the implementation of the improvements through the tools, it was possible to increase the total productivity of the manufacturing workshop from 69.1% obtained in the Pre Test stage to an improved productivity of 81.2%. Finally, the cash flow analysis was carried out, where it was possible to know the indicator of the most probable state with a NPV of S / 136,515.87, the IRR of 147% and an IR of S /. 7.01. With these results it can be concluded that the project is feasible.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de América*
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectDistribución en plantaes_PE
dc.subjectProductividades_PE
dc.subjectIndustria metalmecánicaes_PE
dc.subjectDesign and distributiones_PE
dc.subjectProductivityes_PE
dc.subjectMetalworkinges_PE
dc.titleDiseño y distribución de planta para mejorar la productividad del proceso de fabricación de estructuras metálicas en una empresa metalmecánicaes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeBreñaes_PE
renati.advisor.dni18138289
renati.advisor.orcidhttps://orcid.org/0000-0001-8475-0906es_PE
renati.author.dni44737521
renati.discipline722026es_PE
renati.jurorOrellana Pardavé, José Antonio
renati.jurorPáez Espinal, Fernando
renati.jurorOrtiz Condori, Rafael
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE


Files in this item

Thumbnail
Thumbnail
Thumbnail
Thumbnail

This item appears in the following Collection(s)

Show simple item record

info:eu-repo/semantics/openAccess
Except where otherwise noted, this item's license is described as info:eu-repo/semantics/openAccess