Mostrar el registro sencillo del ítem

dc.contributor.advisorParedes Rosario, Raúl
dc.contributor.authorVillacorta Villanueva, Julio César
dc.date.accessioned2017-05-30T00:02:43Z
dc.date.available2017-05-30T00:02:43Z
dc.date.issued2015-06-12
dc.identifier.citationVillacorta, J. C. (2015). Propuesta de mejora de un sistema de mantenimiento predictivo en el área de taller agrícola para incrementar la rentabilidad de la empresa Agroindustrial Laredo S.A.A. (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/10119es_PE
dc.identifier.other670.202 VILL 2015es_PE
dc.identifier.urihttps://hdl.handle.net/11537/10119
dc.description.abstractRESUMEN La presente tesis se ha elaborado con la finalidad de aumentar la rentabilidad de la empresa Agroindustrial Laredo S.A.A. Para ello se ha planteado mejorar la actual gestión del mantenimiento en el área de Taller agrícola, a través del diseño de un sistema de mantenimiento predictivo. En el primer capítulo se ha realizado el diagnóstico de la situación actual de la empresa, se detectaron los problemas de todas las áreas y se formuló el problema al que se dará solución con esta tesis. En el segundo capítulo se citan antecedentes nacionales e internacionales bajo los cuales se guía el desarrollo de la presente tesis; así mismo se describe la teoría del mantenimiento y métodos a utilizar durante el desarrollo de la tesis para la solución del problema. En el capítulo tercero se hace una descripción general de la empresa para tener una idea más profunda del rubro en el que se desenvuelve, sus procesos, clientes, proveedores, etc. En esta parte también se hace un análisis del problema con herramientas como Ishikawa y Diagrama de Pareto para encontrar las causas raíces que lo originan, teniendo así que los tiempos perdidos inciden directamente en el OEE de la fábrica y por consecuencia afecta la rentabilidad de la empresa. Se plantea una reducción del 20 % del tiempo perdido por falta de disponibilidad de los equipos críticos del área de taller agrícola. En los capítulos 4 y 5 detallo el diseño del sistema del mantenimiento predictivo, el cual atenderá las fallas más críticas de los equipos críticos, para ello se tuvo que evaluar las fallas, determinar los equipos predictivos y la frecuencia de inspección a realizar para cada equipo crítico y sumado a ello un programa de capacitación, con lo cual el personal podrá realizar sin problema las tareas de mantenimiento planteadas. Para culminar, se realiza una evaluación económica financiera obteniéndose un VAN de S/. 264,389 y un TIR de 16.4%, lo cual indica que el proyecto es RENTABLE.es_PE
dc.description.abstractABSTRACT This thesis has been developed in order to increase the profitability of the Agroindustrial Laredo S.A.A. This has been raised to improve the current management of maintenance in the area of agricultural Workshop, through the design of a predictive maintenance system. The first chapter is the diagnosis of the current situation of the company, the problems of all areas were detected and the problem that this thesis will provide solution was formulated. For this work we examined and the respective hypothesis was performed. In the second chapter, national and international background under which the development of this thesis is guided cited; theory likewise maintenance and describes methods used during the development of the thesis to solve the problem. In the third chapter we make an overview of the company to gain a better idea of the area in which it operates, its processes, customers, suppliers, etc. In this part we use the analysis problems tools like ishikawa and Pareto chart to find the root causes that cause it, we found that, the wasted time affect directly to the factory OEE and consequently affects the profitability of the company. We propose a 20% reduction of the wasted time due to lack of availability of critical equipment agricultural workshop area. Chapters 4 and 5 details the design of predictive maintenance system, which is responsible to deal with the most critical flaws of the critical equipment, first I had to evaluated the failure, to define the predictive equipment and frequency of inspection to be performed for each critical equipment and added a training program for the staff, so they can perform without any maintenance problems. To conclude, the result of the financial economic evaluation is: NPV of S/. 264,389 and 16.4% Rate of return. This indicate that the project is profitable.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/embargoedAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectMantenimiento industriales_PE
dc.subjectRentabilidades_PE
dc.subjectAdministración de operacioneses_PE
dc.titlePropuesta de mejora de un sistema de mantenimiento predictivo en el área de taller agrícola para incrementar la rentabilidad de la empresa Agroindustrial Laredo S.A.A.es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeTrujillo San Isidroes_PE
renati.advisor.dni18842530
renati.author.dni70273490
renati.discipline722026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem