Mostrar el registro sencillo del ítem

dc.contributor.advisorSalcedo Rebaza, Wilmer Alejandro
dc.contributor.authorArenaza Vasquez, Guillermo Eduardo
dc.date.accessioned2017-08-10T20:39:18Z
dc.date.available2017-08-10T20:39:18Z
dc.date.issued2017-05-26
dc.identifier.citationArenaza, G. E. (2016). Estudio de factibilidad técnica - económica para implementar una planta de producción de cal en la concesión minera ‘ARVAA 100’ – La Encañada- Cajamarca, 2016 (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de https://hdl.handle.net/11537/10675es_PE
dc.identifier.other622 AREN 2016es_PE
dc.identifier.urihttps://hdl.handle.net/11537/10675
dc.description.abstractRESUMEN Esta tesis fue desarrollada con la finalidad de darle solución al problema de falta de oferta de cal en Cajamarca, implementándose una planta, tiene como objetivo principal determinar la factibilidad técnico-económica del proyecto, a través de un análisis detallado de cada uno de los diversos estudios realizados tales como: El estudio de mercado, técnico y financiero; validando la implementación de dicho proyecto, observando los buenos resultados de los estudios ya mencionados; además de generar más de 50 fuentes de trabajo directo e indirecto en el distrito de La Encañada. Empezamos con la realización de un estudio de mercado para determinar la oferta y la demanda real, las mismas que fueron proyectadas mediante una regresión lineal desde el año 2017 al 2025, permitiéndonos saber cuál va a ser la demanda insatisfecha y de esta manera tener una idea más clara de cuánto será la producción para estos nueve años. Con el estudio técnico se pudo calcular la producción anual que va a ser 18 000 toneladas, en función a las dimensiones y capacidad de los hornos de calcinación que se construirán, también definimos la localización de la planta de producción tratando de encontrar la localización más ventajosa para todas las áreas de trabajo dentro de la planta, posteriormente se escogió todos los equipos y maquinaria que se va a usar, además de cumplir estas con todos los requisitos para completar de manera eficiente una jornada de trabajo. Se identificó todo el proceso de producción de la cal viva, desde la extracción de la materia prima hasta el transporte y comercialización del producto. Se hizo una estimación de reservas dándonos un total de 6 360 000 TMS y una vida útil de la mina de alrededor de 40 años. Finalmente, con ayuda del estudio financiero, establecimos cuanto será la inversión fija del proyecto, como también el costo de operación. Teniendo un precio base por tonelada de cal viva del último año se calculó los ingresos por ventas con una inflación anual del 3%, luego calculamos el costo unitario de fabricación, así como también el punto de equilibrio. El flujo de caja del proyecto se hizo para un periodo de nueve años en donde incluimos un préstamo bancario pagado en dos años con un sistema de amortización con cuota variable, en la evaluación financiera, calculamos los indicadores como: la rentabilidad, TIR (Tasa Interna de Retorno), VAN (Valor Actual Neto), el periodo de recuperación del capital y la relación beneficio/costo, dándonos todos estos indicadores financieros excelentes resultados, dando la opción de aumentar la capacidad instalada adquiriendo nuevas tecnologías, concluyendo económicamente y técnicamente que es factible la implementación de una planta de producción de cal viva molida y granulada en este distrito.es_PE
dc.description.abstractABSTRACT This thesis was developed with the purpose of solving the problem of lack of lime supply in Cajamarca, implementing a plant, its main objective is to determine the technical-economic feasibility of the project, through a detailed analysis of each of the various Studies carried out such as: The market, technical and financial study; Validating the implementation of this project, observing the good results of the studies already mentioned; In addition to generating more than 50 sources of direct and indirect work in the district of La Encañada. We started with a market study to determine the real supply and demand, which were projected through a linear regression from 2017 to 2025, allowing us to know what the demand will be unsatisfied and thus to have an idea More clear how much will be the production for these nine years. With the technical study we were able to calculate the annual production that will be 18 000 tonnes, depending on the size and capacity of the calcination kilns to be built, we also define the location of the production plant trying to find the most advantageous location For all the areas of work within the plant, subsequently all the equipment and machinery to be used were chosen, besides fulfilling these with all the requirements to efficiently complete a working day. The whole production process of quicklime was identified, from the extraction of the raw material to the transportation and commercialization of the product. An estimate of reserves was made giving us a total of 6 360 000 TMS and a mine life of about 40 years. Finally, with the help of the financial study, we established how much will be the fixed investment of the project, as well as the cost of operation. Having a base price per ton of quicklime of the last year, we calculated the sales revenue with an annual inflation of 3%, then we calculate the unit cost of manufacture as well as the break-even point. The cash flow of the project was made for a period of nine years where we included a bank loan paid in two years with a variable rate amortization system, in the financial evaluation, we calculate the indicators as: profitability, IRR (NPV), the period of capital recovery and the profit / cost ratio, giving us all these financial indicators excellent results, giving the option of increasing installed capacity by acquiring new technologies, concluding economically and technically that it is Feasible the implementation of a plant for the production of ground and granulated lime in this district.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/4.0/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectPlanta procesadoraes_PE
dc.subjectProyectos de inversiónes_PE
dc.subjectMineríaes_PE
dc.titleEstudio de factibilidad técnica - económica para implementar una planta de producción de cal en la concesión minera ‘ARVAA 100’ – La Encañada- Cajamarca, 2016es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería de Minases_PE
thesis.degree.nameIngeniero de Minases_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.07.05es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeCajamarcaes_PE
renati.advisor.dni26728630
renati.advisor.orcidhttps://orcid.org/0000-0003-2476-6265es_PE
renati.author.dni47800718
renati.discipline724026es_PE
renati.jurorYataco Dueñas, Vladimir Héctor
renati.jurorFigueroa Alfaro, Richard Wagner
renati.jurorSalazar Ríos, Jorge Luis
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess