Mostrar el registro sencillo del ítem

dc.contributor.advisorHuapaya Barrientos, Jose
dc.contributor.authorFlores Campos, Hersy
dc.date.accessioned2017-08-24T23:41:39Z
dc.date.available2017-08-24T23:41:39Z
dc.date.issued2017-01-22
dc.identifier.citationFlores, H. (2016). Implementar la gestión en el diseño de un plan de mantenimiento preventivo, correctivo y predictivo en el sistema de transporte terrestre para el proyecto minero La Zanja (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de https://hdl.handle.net/11537/10815es_PE
dc.identifier.other670.202 FLORes_PE
dc.identifier.urihttps://hdl.handle.net/11537/10815
dc.description.abstractRESUMEN El presente trabajo propone aplicar la gestión de mantenimiento preventivo, correctivo y predictivo en un sistema de transporte terrestre para el proyecto minero la Zanja que servirá para reducir las elevadas horas paralizadas e improductivas y con demasiadas cantidades de fallas en cada periodo. En el primer capítulo se explicarán la justificación, objetivo general y objetivos específicos en el cual se explicará la problemática sobre el cual se ejecutará la mejora del proyecto. En el segundo capítulo se explicarán los conceptos básicos que serán usados en el análisis de la situación de la problemática y sobre los cuales se construirá el modelo de gestión del mantenimiento. Inicialmente se detallarán los tipos de mantenimiento más conocidos llegando a algunas teorías como confiabilidad y disponibilidad. En el tercer capítulo se explicar el desarrollo del problema en donde se detalla la ubicación y localización donde se ejecutó la tesis, también se detalla y explica la organización de la empresa del área que ser evaluado para la mejora, adicionalmente se explicará la situación real en que se encontraba antes de aplicar la mejora y también depuse de aplicar la mejora. En el cuarto capítulo se explicará los resultados finales obtenidos con ayudados de las herramientas de gestión de mantenimiento y se mostrará los resultados finales de la disponibilidad para su comparación aplicando la mejora, con un beneficio en la reducción de horas paralizadas del 70 % y también la reducción de cantidad de fallas generas en cada periodo de operación del camión. En el quinto capítulo se realizará un análisis del nivel de mantenimiento y una buena disponibilidad del equipo. Finalmente, presentaremos las conclusiones y recomendacioneses_PE
dc.description.abstractABSTRACT The present work proposes to apply preventive, corrective and predictive maintenance management in a land transport system for the Zanja mining project, which will serve to reduce the high paralyzed and unproductive hours and with too many failures in each period. The first chapter will explain the justification, general objective and specific objectives in which the problem will be explained on which to execute the improvement of the Project. The second chapter will explain the basic concepts that will be used in the analysis of the situation of the problem and on which the maintenance management model will be built. Initially, the most well-known types of maintenance will be described, leading to some theories such as reliability and availability. In the third chapter we explain the development of the problem where the location and location where the thesis was executed is also detailed and also explains the organization of the area company to be evaluated for improvement. That was before applying the improvement and also decided to implement the improvement. In the fourth chapter we will explain the final results obtained with the help of maintenance management tools and will show the final results of the availability for comparison by applying the improvement, with a benefit in the reduction of paralyzed hours of 70% and also the Reduction of the number of failures generated in each period of operation of the truck. The fifth chapter will analyze the level of maintenance and availability of equipment. Finally, we will present the conclusions and recommendations reached during the analyzes and studies carried out in this Project.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectIngeniería Industriales_PE
dc.subjectMantenimiento industriales_PE
dc.subjectAdministración de procesoses_PE
dc.titleImplementar la gestión en el diseño de un plan de mantenimiento preventivo, correctivo y predictivo en el sistema de transporte terrestre para el proyecto minero La Zanjaes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeLos Olivoses_PE
renati.author.dni44224128
renati.discipline722026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem