dc.identifier.citationMartell, P. R. (2017). Optimización de costos mediante la implementación de una construcción pre fabricada en el proceso constructivo de las obras civiles de una subestación compacta bóveda subterránea en la empresa Lilestrom S.A.C (Tesis de licenciatura). Recuperado de http://hdl.handle.net/11537/11408es_PE
dc.identifier.other670.42 MART 2017es_PE
dc.identifier.urihttps://hdl.handle.net/11537/11408
dc.description.abstractRESUMEN La presente investigación tiene como finalidad la optimización de costos y minimizar tiempos mediante la presentación de un nuevo proceso que es el sistema pre fabricado, realizado en la empresa LILESTROM S.A.C. para un proceso constructivo de obras civiles de una subestación compacta bóveda subterránea en la ciudad de Lima. Tomando registros de otras tesis con el sistema pre fabricado en distintas construcciones, se reveló que este sistema es muy usado en países desarrollados y en vía de desarrollo por los grandes beneficios de tipo económico, la creación de nuevas tecnologías para su construcción y la apertura para nuevos mercados. En Lima las construcciones de las subestaciones compactas bóvedas subterráneas ejecutadas por las contratitas de la empresa ENEL antes con nombre EDELNOR S.A. son realizadas de forma tradicional es decir in situ debido al diseño del cliente, para este nuevo sistema de construcción se aumentarán los anclajes para los muros, la aplicación de un material impermeable como sistema de seguridad ante filtraciones de agua, transporte de bloques de concreto como producto pre fabricado y su instalación con máquinas apropiadas, ya que los cálculos de pesos de bloques es parte de la investigación. Los procesos, cronogramas, presupuesto de mano de obra sustentado por el análisis de precios unitarios (APU), la curvas “S” , diagramas de operaciones y procesos (DOP) y el diagrama Ishikawa serán mostrados por el estudio realizado, comparando los tipos el sistema tradicional contra el pre fabricado, de esta manera se resolverán los objetivos específicos presentados. Para finalizar se presentará mediante gráficos de los beneficios cuantitativos explicado en unidades monetarias y mencionará los beneficios cualitativos, para concluir esta investigación dará inicio a futuras investigaciones que desean construir de modo pre fabricado dirigido al mercado eléctrico. PALABRAS CLAVE: construcción pre fabricado y subestaciones pre fabricado.es_PE
dc.description.abstractABSTRACT The present research aims at optimizing costs and minimizing time by presenting a new process that is the pre-fabricated system, made in the company LILESTROM S.A.C. For a construction process of civil works of a compact substation in a vault in the city of lima. Taking records of other theses. It was revealed that this system is widely used in developed countries, due to the great economic benefits, the creation of new technologies for its construction and the opening for new markets. In Lima, the constructions of the compact substations of underground vaults are executed by the company ENEL, which was called EDELNOR S.A. before. They are performed in a traditional way. That is, in situ, due to the customer's design. For this new design the wall anchors will be increased, the application of impermeable material as a security system to prevent water filtrations, transport of concrete blocks as a product pre-fabricated and its installation with appropriate machines; Since the calculation of block weights is part of the investigation. The processes, schedules, budgets are supported by the unit price analysis (APU), the "S" curve and the Ishikawa diagram, they will be shown by the study done, comparing the types of traditional systems against the pre fabricated. This will solve the specific objectives presented. Finally, the quantitative benefits explained in monetary units and will be presented by graphics. Also, the qualitative benefits will be mentioned. In conclusion, this research will initiate future researches that wish to build in a pre-fabricated way to the electric market. KEYWORDS: pre-fabricated construction and pre-fabricated substations.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de Américaes_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectControl de procesos informatizadoes_PE
dc.subjectAnálisis de costoses_PE
dc.subjectGestión de la construcciónes_PE
dc.subjectCostos de construcciónes_PE
dc.titleOptimización de costos mediante la implementación de una construcción pre fabricada en el proceso constructivo de las obras civiles de una subestación compacta bóveda subterránea en la empresa Lilestrom S.A.Ces_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeLos Olivoses_PE
renati.advisor.dni09634918
renati.author.dni42737092
renati.discipline722026es_PE
renati.jurorBravo Orellana, Miriam
renati.jurorPiscoya Silva, Ulises
renati.jurorColonio Garcia, Luis
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess