Mostrar el registro sencillo del ítem

dc.contributor.advisorMacetas Porras, Paolo
dc.contributor.authorSoler Espinoza, Rixser
dc.date.accessioned2018-12-11T17:32:37Z
dc.date.available2018-12-11T17:32:37Z
dc.date.issued2018
dc.identifier.citationSoler, R. (2018). Propuesta de mejora en la gestión de proyecto estructural de la sede del Ministerio Público de Lima Norte en el distrito de Independencia con la implementación del BIM (Trabajo de suficiencia profesional). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/14381es_PE
dc.identifier.other624.1771 SOLE 2018es_PE
dc.identifier.urihttps://hdl.handle.net/11537/14381
dc.description.abstractRESUMEN La presente investigación tiene como objetivo en proponer la mejora en la gestión del proyecto estructural de la Sede del Ministerio Público de Lima Norte, con la implementación del BIM (Building Information Modeling), para tal fin se ha realizado diferentes actividades de cómo reducir las inconsistencias en la documentación consideradas del proyecto estructural con el uso del software BIM, como también en reducir en número de días la gestión del proyecto estructural con BIM y sin BIM (Sistema tradicional) frente a una modificación arquitectónica. Con la aplicación BIM accedió obtener mejoras en la en la gestión del proyecto estructural tales como, obtener un flujo de trabajo colaborativo, obtención aparte del modelo analítico obtener un modelo físico de la estructura y obtener de forma automatizada la Documentación, también se ha logrado reducir las inconsistencias en la documentación consideradas del proyecto estructural con el uso de software BIM al 0%, y en la gestión del proyecto estructural frente a una modificación arquitectónica con BIM permitió en promedio reducir en 3 días con respecto a un trabajo tradicional. Lo antes descrito se detalla en el desarrollo del presente, dando los resultados, conclusiones y seguidamente se dan las recomendaciones para la implementación del BIM. El presente sirve como propuesta para la implementación del BIM en la gestión del proyecto de la especialidad de estructuras. Soleres_PE
dc.description.abstractABSTRACT The present investigation has as objective to propose the improvement in the management of the structural project of the Office of the Public Prosecutor of Lima North, with the implementation of the BIM (Building Information Modeling), for this purpose it has carried out different activities of how to reduce the inconsistencies in the documentation considered of the structural project with the use of the BIM software, as well as in reducing in number of days the management of the structural project with BIM and without BIM (Traditional System) in front of an architectural modification. With the application BIM agreed to obtain improvements in the management of the structural project such as obtaining a collaborative workflow, obtaining apart from the analytical model, obtaining a physical model of the structure and obtaining the Documentation in an automated way, it has also been possible to reduce the inconsistencies in the documentation considered of the structural project with the use of BIM software at 0%, and in the management of the structural project against an architectural modification with BIM allowed on average to reduce in 3 days with respect to a traditional work. The above described is detailed in the development of the present, giving the results, conclusions and then the recommendations for the implementation of the BIM are given. The present serves as a proposal for the implementation of the BIM in the management of the project of the specialty of structures Soleres_PE
dc.description.uriTrabajo de suficiencia profesionales_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 2.5 Perúes_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/2.5/pe/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectTesises_PE
dc.subjectIngeniería civiles_PE
dc.subjectAnálisis estructurales_PE
dc.subjectEstructurases_PE
dc.subjectGestión de la construcciónes_PE
dc.subjectGestión de proyectoses_PE
dc.titlePropuesta de mejora en la gestión de proyecto estructural de la sede del Ministerio Público de Lima Norte en el distrito de Independencia con la implementación del BIMes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Civiles_PE
thesis.degree.nameIngeniero Civiles_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeLos Olivoses_PE
renati.discipline732016es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesionales_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess