• español
    • English
View Item 
  •   DSpace Home
  • Facultad de Ingeniería
  • Ingeniería Industrial
  • Tesis
  • View Item
  •   DSpace Home
  • Facultad de Ingeniería
  • Ingeniería Industrial
  • Tesis
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Diseño de un plan de gestión de mantenimiento para mejorar la disponibilidad mecánica de la maquinaria pesada en la empresa Martinez Contratistas e Ingeniería S.A. - Arequipa, 2018

Thumbnail
View/Open
Descargar
(application/pdf: 4.799Mb)
Embargado
(application/vnd.openxmlformats-officedocument.wordprocessingml.document: 4.364Mb)
Embargado hasta el 02/09/2070
Date
2018-10-15
Author
Amambal Alaya, Fernando
Huatay Caja, Carlos Víctor
Metadata
Show full item record
Abstract
RESUMEN La presente investigación es de tipo descriptiva analítica, que presenta su problema en el área de mantenimiento mecánico debido a las constantes paradas no programadas por fallas imprevistas de la maquinaria pesada de la Empresa Martínez Contratistas E Ingeniería S.A; por lo que se tuvo como principal objetivo diseñar un plan de gestión de mantenimiento para mejorar la disponibilidad mecánica de la maquinaria pesada, mediante cambios técnicos y operativos que podrán disminuir las paradas no programadas, mejorando el proceso de producción en general. Luego de analizar y evaluar la situación de la deficiencia de la disponibilidad de los equipos, se presentó el diseño de un plan de gestión de mantenimiento para mejorar la disponibilidad mecánica, la cual se encuentra en promedio general en un 86.97%; se espera que con la posible aplicación del diseño de un plan de gestión de mantenimiento la disponibilidad mecánica mejorara en un 92%, dicho diseño de un plan de gestión de mantenimiento es elaborado en base a las oportunidades de mejora del área de mantenimiento de la Empresa Martínez Contratistas E Ingeniería S.A., De la misma manera se hizo la valoración económica del plan de gestión de mantenimiento la cual asciende a un costo de $. 618, 375.58 en repuestos, mas $. 615,360.00 que se dejaría de percibir por las paradas en la posible ejecución del nuevo plan de mantenimiento correctivo, ya que al no contar con este diseño la empresa habría perdió $ 2, 933,800.00 en el año 2017 en horas/maquina. Se llegó a la conclusión de proponer el diseño de un plan de gestión de mantenimiento para mejorar la disponibilidad mecánica, así mismo reducir las constantes paradas no programas y de esta manera aumentar la rentabilidad de la empresa. PALABRAS CLAVE: Gestión de mantenimiento, baja disponibilidad mecánica, utilización de la máquina, puntos críticos, diseño de mantenimiento.
Mostrar más
 
ABSTRACT The present investigation is of descriptive analytical type, that presents its problem in the area of mechanical maintenance due to the constant unscheduled stops for unexpected failures of the heavy machinery of the Company Martínez Contratistas E Ingeniería S.A; therefore, the main objective was to design a maintenance management plan to improve the mechanical availability of heavy machinery, through technical and operational changes that may reduce unscheduled downtime, improving the overall production process. After analyzing and evaluating the situation of the deficiency of equipment availability, the design of a maintenance management plan was presented to improve mechanical availability, which is in general average at 86.97%; it is expected that with the possible application of the design of a maintenance management plan the mechanical availability will improve by 92%, said design of a maintenance management plan is elaborated based on the improvement opportunities of the maintenance area of the Company Martínez Contratistas E Ingeniería SA, In the same way, the economic evaluation of the maintenance management plan was made, which amounts to a cost of $. 618, 375.58 in spare parts, plus $. 615,360.00 That would not be received due to the stops in the possible execution of the new corrective maintenance plan, since by not having this design the company would have lost $ 2,933,800.00 in 2017 in hours / machine. It was concluded to propose the design of a maintenance management plan to improve the mechanical availability, as well as reduce the constant stops no programs and in this way increase the profitability of the company. KEYWORDS: Maintenance management, low mechanical availability, use of the machine, critical points, maintenance design.
Mostrar más
 
URI
https://hdl.handle.net/11537/14562
Bibliographic citation
Amambal, F., & Huatay, C. V. (2018). Diseño de un plan de gestión de mantenimiento para mejorar la disponibilidad mecánica de la maquinaria pesada en la empresa Martinez Contratistas e Ingeniería S.A. - Arequipa, 2018 (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/14562
Subject
Mantenimiento
Maquinarias
Ingeniería industrial
Collections
  • Tesis [2302]

Related items

Showing items related by title, author, creator and subject.

  • Thumbnail

    Diseño de un plan de gestión de mantenimiento para incrementar la disponibinilidad mecánica de equipos en la empresa San Martin Contratistas Generales S.A. en el proyecto Tantahuatay 2018 

    Herrera Vargas, Alan Raúl (Universidad Privada del Norte, 2019-02-11)
    Acceso abierto
    RESUMEN El presente estudio tuvo como objetivo diseñar un plan de gestión de mantenimiento en la empresa San Martin Contratistas Generales S.A, donde se pretende incrementar la disponibilidad mecánica aplicada a la flota ...
  • Thumbnail

    Diseño de un sistema de gestión de mantenimiento predictivo y su relación con la disponibilidad mecánica de las excavadoras Hitachi 2500 en una empresa minera, 2018 

    Jara Yalta, Edgar Martín; Condori Portocarrero, Yury (Universidad Privada del Norte, 2019-09-12)
    Acceso abierto
    RESUMEN El presente estudio se realizó en el área de mantenimiento de una empresa minera en el departamento de Cajamarca, tuvo como objetivo principal el diseño de un sistema de gestión de mantenimiento predictivo y su ...
  • Thumbnail

    Implementación de un plan de mantenimiento centrado en confiabilidad para mejorar la disponibilidad mecánica de los camiones 785 en una empresa contratista minera 

    Jurado Delgado, Miguel Enrique (Universidad Privada del Norte, 2018)
    Embargado
    La presente tesis expone una propuesta de mejora en la disponibilidad mecánica de los camiones mineros 785 en una empresa contratista que brinda servicios de movimiento de tierras a la minera. La propuesta de mejora se ...

Contacto:  [email protected]

  • Estadísticas
  • English 
    • español
    • English
  • Login

Todos los derechos reservados.
 

 

Documentos
Política del Repositorio Institucional UPN

Browse

All of DSpaceCommunities & CollectionsBy Issue DateAuthorsAdvisorsTitlesSubjectsVenuesTypes of researchThis CollectionBy Issue DateAuthorsAdvisorsTitlesSubjectsVenuesTypes of research

Contacto:  [email protected]

  • Estadísticas
  • English 
    • español
    • English
  • Login

Todos los derechos reservados.