Mostrar el registro sencillo del ítem

dc.contributor.advisorVega Rivera, Gerson
dc.contributor.authorVeliz Poma, Gregorio Fidel
dc.date.accessioned2019-05-19T17:39:32Z
dc.date.available2019-05-19T17:39:32Z
dc.date.issued2019-04-06
dc.identifier.citationVeliz, G. F. (2019). Evaluación de la ampliación del depósito de desmonte Botadero 100 de la mina Cerro Lindo año 2019 [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/21265es_PE
dc.identifier.other624.171 VELI 2019es_PE
dc.identifier.urihttps://hdl.handle.net/11537/21265
dc.description.abstractEl presente trabajo de investigación tiene como objetivo el diseño y análisis de estabilidad del botadero 100 como parte de la ampliación. La conformación del depósito de desmonte en la etapa de ampliación se realizará por banquetas que consistente en apilamiento y compactación que tendrá una altura de 25 metros con un talud de vertido de 1H: 1.60V metros que asegura la estabilidad física del depósito. Los taludes son de mayor importancia en este trabajo, dado que su configuración vertical y horizontal son factores, que nos ayudaron a determinar el diseño y análisis final para la estabilidad del botadero en investigación. El análisis de estabilidad se efectuó utilizando modelos de equilibrio límite y el método de Spencer con la ayuda del programa Slide V.6 de la familia de Rocsciencie. Milpo es una empresa dedicada a la actividad minera, que a la fecha se encuentra operando la unidad de producción Cerro Lindo, obteniendo concentrados de zinc, plomo y cobre. Cerro Lindo inició sus operaciones en junio del 2007 con una producción de 5000 tpd. Actualmente la producción de la planta concentradora es de 21,100 tpd. A finales del año 2013 y comienzos del 2014, SVS realiza el diseño del depósito de desmontes botadero 100 a través de “Estudio de ingeniería básica y de detalle del Botadero 100” En función a un plan anual de producción de desmontes, Milpo requiere de una desmontera que pueda cubrir un almacenamiento adicional mínimo 500,000 metros cúbicos de desmonte.es_PE
dc.description.abstractThe objective of this research work is to design and analyze the stability of the dump 100 as part of the expansion. The formation of the debris deposit in the expansion stage will be made by sidewalks consisting of stacking and compaction that will have a height of 25 meters with a slope of 1H discharge: 1.60V meters that ensures the physical stability of the deposit. The slopes are of greater importance in this work, given that their vertical and horizontal configuration are factors that helped us determine the design and final analysis for the stability of the dump under investigation. The stability analysis was carried out using limit equilibrium models and the Spencer method with the help of the Slide V.6 program of the Rocsciencie family. Milpo is a company dedicated to the mining activity, which to date is operating the Cerro Lindo production unit, obtaining zinc, lead and copper concentrates. Cerro Lindo started operations in June 2007 with a production of 5000 tpd. Currently the production of the concentrator plant is 21,100 tpd. At the end of 2013 and beginning of 2014, SVS carries out the design of the waste dump 100 through "Basic and Detail Engineering Study of the 100 Dump" According to an annual plan for the production of clearings, Milpo requires a dismantler that can cover an additional minimum storage of 500,000 cubic meters of waste.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/msword
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de América
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectEstabilidades_PE
dc.subjectExcavaciónes_PE
dc.subjectTopografíaes_PE
dc.subjectMineríaes_PE
dc.subjectTratamiento (desmineralización)es_PE
dc.titleEvaluación de la ampliación del depósito de desmonte Botadero 100 de la mina Cerro Lindo año 2019es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Civiles_PE
thesis.degree.nameIngeniero Civiles_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeLos Olivoses_PE
renati.advisor.dni10390118
renati.advisor.orcidhttps://orcid.org/0000-0002-8672-3239
renati.author.dni21137495
renati.discipline732016es_PE
renati.jurorGuardia, Cesar
renati.jurorBarrenechea, Taylor
renati.jurorRivera, Cesar
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess