Mostrar el registro sencillo del ítem

dc.contributor.advisorVilca Pérez, Jesús Gabriel
dc.contributor.authorContreras Garcia, Adelmar Alex
dc.date.accessioned2021-02-03T23:06:08Z
dc.date.available2021-02-03T23:06:08Z
dc.date.issued2020-10-14
dc.identifier.citationContreras, A. A. (2020). Estudio de factibilidad técnico económica para determinar la rentabilidad del yacimiento, Apurímac, 2018 (Trabajo de investigación). Repositorio de la Universidad Privada del Norte. Recuperado de https://hdl.handle.net/11537/24918es_PE
dc.identifier.other622 CONT 2020es_PE
dc.identifier.urihttps://hdl.handle.net/11537/24918
dc.description.abstractEn el presente trabajo se tuvo como objetivo principal realizar un estudio de factibilidad teórico económica para determinar la rentabilidad del yacimiento. Se analizó e identificó los estimados de producción de 2000 Tm mensuales, calculando un costo total $230,000.00, que se tendrá en la extracción, transporte y proceso y un valor de venta de concentrado de $761,218.55, obteniendo una Utilidad bruta de $ 531,218.55. Al evaluar la rentabilidad de los yacimientos, se pretende obtener un financiamiento de $1,800,000.00, que se terminará pagando con el resultado del segundo año, tras obtener un monto de $2,497,268.00 según el flujo de caja, y en la proyección al quinto año el saldo neto es de $22,157,268.00, demostrando que no hay riesgo en invertir en estos yacimientos. Entonces primero se debe tener en cuenta el total de compras como maquinaria y equipos, teniendo un valor de $9,226,600.00. También se debe tener en cuenta los Costos Directos en producción y planillas con una proyección a 2 meses, teniendo como montos de $32,400.00 y $137,578.00. Además, también se tuvo en cuenta el monto del transporte de las máquinas y equipos adquiridos, teniendo un costo de $63,780.00. Por consiguiente, analizando el costo de infraestructura, se estima un valor de $28,530,000.00, y por último en caso de imprevistos se estima un monto de $2,009,642.00. Todos estos montos de requerimientos dan un total de $40,000,000.00 los que serán cubiertos en el trayecto del tiempo Tanto el VAN Económico y Financiero tienen un valor de $16,426,268.60, porque el Flujo Neto Económico y financiero no varía, ya que las deudas del préstamo se considerarán a partir del segundo año y con una tasa de 1.10% mensual. Entonces el TIR (Tasa de Interés de Retorno) será de 41% y de esta manera el PRI (Periodo de Recuperación de Inversión) será en 7.15 meses y B/C (Beneficio Costo) será de 4.83 aproximadamente, comparando de forma directa los beneficios y los costos. Con estos resultados podemos determinar que el proyecto es viable por las ganancias sustanciales.es_PE
dc.description.abstractThe main objective of this work was to carry out a theoretical and economic feasibility study to determine the profitability of the deposit. The production estimates of 2,000 tons per month were analyzed and identified, calculating a total cost of $ 230,000.00, which will be incurred in the extraction, transportation and process, and a sale value of $ 761,218.55 for the concentrate, obtaining a gross profit of $ 531,218.55. When evaluating the profitability of the fields, it is intended to obtain financing of $ 1,800,000.00, which will end up being paid with the result of the second year, after obtaining an amount of $ 2,497,268.00 according to the cash flow, and in the projection to the fifth year the net balance is of $ 22,157,268.00, showing that there is no risk in investing in these deposits. Then, first, the total purchases such as machinery and equipment must be taken into account, having a value of $ 9,226,600.00. The Direct Costs in production and payroll with a 2-month projection must also be taken into account, having as amounts of $ 32,400.00 and $ 137,578.00. In addition, the amount of transportation of the purchased machines and equipment was also taken into account, at a cost of $ 63,780.00. Therefore, analyzing the cost of infrastructure, a value of $ 28,530,000.00 is estimated, and finally, in case of unforeseen events, an amount of $ 2,009,642.00 is estimated. All these amounts of requirements give a total of $ 40,000,000.00 which will be covered over time. Both the Economic and Financial NPV have a value of $ 16,426,268.60, because the Net Economic and Financial Flow does not vary, since the loan debts will be considered from the second year and with a monthly rate of 1.10%. Then the IRR (Return Interest Rate) will be 41% and in this way the PRI (Investment Recovery Period) will be in 7.15 months and B / C (Benefit Cost) will be approximately 4.83, directly comparing the benefits and costs. With these results we can determine that the project is viable due to the substantial profits.es_PE
dc.description.uriTrabajo de investigaciónes_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de Américaes_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectEstudios de viabilidades_PE
dc.subjectAnálisis de costoses_PE
dc.subjectRentabilidades_PE
dc.subjectMineríaes_PE
dc.titleEstudio de factibilidad técnico económica para determinar la rentabilidad del yacimiento, Apurímac, 2018es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelBachilleres_PE
thesis.degree.disciplineIngeniería de Minases_PE
thesis.degree.nameBachiller en Ingeniería de Minases_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.07.05es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeTrujillo San Isidroes_PE
renati.advisor.dni41779520
renati.advisor.orcidhttps://orcid.org/0000-0002-8348-8624es_PE
renati.author.dni47145817
renati.discipline724026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#bachilleres_PE
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeInvestigaciones_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess