Mostrar el registro sencillo del ítem

dc.contributor.advisorLabán Salguero, María Liz
dc.contributor.authorMiranda Salinas, Yerson Rubén
dc.date.accessioned2021-03-02T21:42:21Z
dc.date.available2021-03-02T21:42:21Z
dc.date.issued2020-10-25
dc.identifier.citationMiranda, Y. R. (2020). Implementación de un plan de mantenimiento predictivo por análisis de vibraciones en equipos rotativos críticos en la central termoeléctrica Santo Domingo de los Olleros (Trabajo de suficiencia profesional). Repositorio de la Universidad Privada del Norte. Recuperado de https://hdl.handle.net/11537/25115es_PE
dc.identifier.other658.202 MIRA 2020es_PE
dc.identifier.urihttps://hdl.handle.net/11537/25115
dc.description.abstractEn los últimos años el rubro de la energía eléctrica ha crecido su demanda notoriamente creándose nuevas centrales de generación eléctrica en el Perú. Los requerimientos de confiabilidad de los equipos rotativos, en el mantenimiento predictivo se hacen cada vez más importantes. Para poder mantener una continuidad en los procesos de producción y poder evitar una falla catastrófica, en los equipos rotativos, en ese sentido en la Termoeléctrica Santo Domingo de los Olleros se va a implementar el mantenimiento predictivo por análisis de vibraciones en equipos rotativos críticos, a través del análisis vibraciones, siendo estos equipos seleccionados en un total de 10 equipos rotativos críticos. En el capítulo I, se desarrolló el diagnostico situacional actual de los equipos rotativos críticos, enfocándose el esfuerzo en motores, bombas, ventiladores de lo cual se eligió 10 equipos rotativos siendo esto los más críticos. En el capítulo II, se trabajó las bases teóricas elaboradas de investigación de tesis y paper en la materia. En el capítulo III, se realizado el diagnostico situacional y la selección de alternativa de solución, se consideró cuatro criterios para la selección de la alternativa: Seguridad, reducción de falla, tiempo de implementación, costo de implementación En el capítulo IV, se ha desarrollado la propuesta de mejora en el cual se ha enfocado en dos capacitaciones y dos procedimientos. Capacitación al personal con los siguientes temas: Manual de uso de equipo analizador, Guía de toma de datos en campo con el equipo analizador, Procedimientos operativos específicos con los siguientes temas: a) toma de datos de vibración de equipos rotativos Motor-Bomba Sistema de refrigeración. b) Toma de datos de vibración de equipos rotativos Motor-Bomba Sistema de Lubricación. En el capítulo V, se ha llegado a la conclusión, que se logró una reducción de la parada de los equipos rotativos críticos de un 20% a un 10%, se la logrado una mejora en el tiempo de disponibilidad de los equipos rotativos, reducción de 2300 horas a 2450 horas entre fallas. Lo cual genero un ingreso adicional de S/. 8,635.776 mil soles en el periodo 2019 con respecto al 2018. Se realizó la evaluación financiera en el cual se obtuvo, los siguientes indicadores de rentabilidad VAN = S/ 681,312, TIR = 226% superior al WACC, B/C= S/ 7.73 y con un retorno de la inversión= 6.13 meses.es_PE
dc.description.abstractIn recent years, the electricity sector has grown in demand notably, creating new power generation plants in Peru. The reliability requirements of rotating equipment in predictive maintenance are becoming increasingly important. In order to maintain continuity in the production processes and to avoid a catastrophic failure in rotating equipment, in that sense, the Santo Domingo de los Olleros Thermoelectric Plant will implement predictive maintenance by vibration analysis in critical rotating equipment, through vibration analysis, these teams being selected from a total of 10 critical rotating teams. In chapter I, the current situational diagnosis of critical rotating equipment was developed, focusing the effort on motors, pumps, fans, of which 10 rotating equipment was chosen, being these the most critical. In Chapter II, the theoretical bases developed for thesis and paper research on the subject were worked on. In chapter III, the situational diagnosis and the selection of alternative solution were carried out, four criteria were considered for the selection of the alternative: Safety, reduction of failure, implementation time, implementation cost In chapter IV, it has been developed the improvement proposal in which it has focused on two trainings and two procedures. Training of personnel with the following topics: Manual for the use of analyzer equipment, Guide for data collection in the field with the analyzer equipment, Specific operating procedures with the following topics: a) collection of vibration data from rotating equipment Motor-Pump refrigeration. b) Taking vibration data from rotating equipment. Motor-Pump Lubrication System. In Chapter V, the conclusion has been reached that a reduction in the stoppage of critical rotating equipment was achieved from 20% to 10%, an improvement in the availability time of rotating equipment was achieved, reduction of 2300 hours to 2450 hours between failures. Which generated an additional income of S /. 8,635,776 thousand soles in the period 2019 compared to 2018. The financial evaluation was carried out in which the following profitability indicators VAN = S / 681,312, IRR = 226% higher than the WACC, B / C = S / 7.73 and with a return on investment = 6.13 months.es_PE
dc.description.uriTrabajo de suficiencia profesionales_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de Américaes_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectMantenimiento productivo totales_PE
dc.subjectMantenimiento industriales_PE
dc.subjectInstalaciones eléctricases_PE
dc.titleImplementación de un plan de mantenimiento predictivo por análisis de vibraciones en equipos rotativos críticos en la central termoeléctrica Santo Domingo de los Olleroses_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeLos Olivoses_PE
renati.advisor.dni40648405
renati.advisor.orcidhttps://orcid.org/0000-0001-6931-5156es_PE
renati.author.dni40743852
renati.discipline722026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesionales_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess