Mostrar el registro sencillo del ítem

dc.contributor.advisorCanta Honores, Jorge Luis
dc.contributor.authorArela Huaman, Jhonatan
dc.date.accessioned2021-03-02T23:35:26Z
dc.date.available2021-03-02T23:35:26Z
dc.date.issued2020-11-30
dc.identifier.citationArela, J. (2018). Estudio comparativo de las edificaciones que aplican la planificación y control con el enfoque Lean Construction y las convencionales, respecto a la productividad en acabados, Puente Piedra, 2018 (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de https://hdl.handle.net/11537/25122es_PE
dc.identifier.other693.1 AREL 2018es_PE
dc.identifier.urihttps://hdl.handle.net/11537/25122
dc.description.abstractLa presente investigación titulada “Estudio comparativo de las edificaciones que aplican la planificación tradicional y el sistema Last Planner en las partidas de acabados de las edificaciones que aplican la planificación y control con el enfoque Lean Construction y las convencionales, respecto a la productividad en la mano de obra en las partidas de acabados en el distrito de Puente Piedra” cuyo objetivo principal fue identificar las diferencias que existen en las edificaciones que aplican la planificación y control con el enfoque Lean Construction y las convencionales, respecto a la productividad en la mano de obra en las partidas de acabados.. La muestra a analizar serán las partidas de acabados de dos obras que tiene la misma similitud respecto según el tipo de edificación ejecutada las cuales son construcción de Aulas, en ambos casos mediremos el nivel de productividad que se tiene en el expediente técnico y el nivel de productividad real que se maneja en campo empleando el enfoque Lean construction y el convencional. La presente investigación es de tipo descriptiva y comparativa, ya que describiremos cada una de las filosofías aplicadas en nuestras 2 muestras, en una muestra se aplicó la planificación y control tradicional; y en la segunda muestra se aplicó una herramienta del enfoque Lean construction conocida como Last Planner (Ultimo planificador) y las compararemos para así evaluar cuál es la diferencia entre ambas en los aspectos de planeamiento y control., lo cual se vio reforzado en los resultados, los cuales señalaran cuál de los dos enfoques es el que mejor productividad nos proporciona en la ejecución de la obra. Al finalizar la investigación se determinó que existen diferencias significativas entre edificaciones que aplican la planificación y control con el enfoque Lean Construction y las convencionales, respecto a la productividad en la mano de obra en las partidas de acabados, debido a que enfoque lean mejora nuestra productividad.es_PE
dc.description.abstractThe present investigation titled “Comparative study of buildings that apply traditional planning and the Last Planner system in the finishing parts of buildings that apply planning and control with the Lean Construction and conventional approach, regarding productivity at hand of work in the finished items in the Puente Piedra district ”whose main objective was to identify the differences that exist in buildings that apply planning and control with the Lean Construction approach and the conventional ones, with respect to labor productivity in the finishing games. The sample to be analyzed will be the finishing games of two works that have the same similarity with respect to the type of building executed which are Classroom construction, in both cases we will measure the level of productivity that is in the technical file and the level of real productivity that is managed in the field using the approach e Lean construction and conventional. The present investigation is descriptive and comparative, since we will describe each of the philosophies applied in our 2 samples, in one sample the traditional planning and control was applied; and in the second sample a Lean construction approach tool known as Last Planner was applied and we will compare them in order to evaluate what is the difference between the two in planning and control aspects, which was reinforced in the results , which will indicate which of the two approaches is the one that provides us with the best productivity in the execution of the work. At the end of the investigation, it was determined that there are significant differences between buildings that apply planning and control with the Lean Construction approach and the conventional ones, regarding the productivity of the workforce in the finished items, because the lean approach improves our productivity.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/embargoedAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectConstrucción de albañileríaes_PE
dc.subjectProductividades_PE
dc.subjectMano de obraes_PE
dc.titleEstudio comparativo de las edificaciones que aplican la planificación y control con el enfoque Lean Construction y las convencionales, respecto a la productividad en acabados, Puente Piedra, 2018es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Civiles_PE
thesis.degree.nameIngeniero Civiles_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeLos Olivoses_PE
renati.advisor.dni10743048
renati.advisor.orcidhttps://orcid.org/0000-0002-9232-1359es_PE
renati.author.dni47970319
renati.discipline732016es_PE
renati.jurorAquise Dueñas, Edwin Jhon
renati.jurorQuesada Llanto, Julio Christian
renati.jurorVildoso Flores, Alejandro
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE