dc.contributor.advisor | Vildoso Flores, Alejandro | |
dc.contributor.author | Choton Camacho, Juan Junior | |
dc.contributor.author | Vicuña Apolinario, Marco Antonio | |
dc.date.accessioned | 2021-12-15T21:39:40Z | |
dc.date.available | 2021-12-15T21:39:40Z | |
dc.date.issued | 2021-11-16 | |
dc.identifier.citation | Choton, J. J., & Vicuña, M. A. (2021). Influencia de la gestión de riesgos en los costos y cronograma utilizando la simulación de Montecarlo del edificio multifamiliar Infinitum – Miraflores. Lima 2020 [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte.
https://repositorio.upn.edu.pe/handle/11537/29143 | es_PE |
dc.identifier.other | 624.92 CHOT 2021 | es_PE |
dc.identifier.uri | https://hdl.handle.net/11537/29143 | |
dc.description.abstract | El siguiente estudio tiene como objetivo determinar la influencia de la gestión de riesgos en los costos y cronograma utilizando la simulación de Montecarlo del edificio multifamiliar INFINITUM – MIRAFLORES en el periodo 2020. Buscando, demostrar, como la gestión de riesgos influencia en los costos y cronograma, obteniendo de esa manera índices a tener en cuenta, para realizar una buena prevención.
En el estudio se aplicó el método hipotético deductivo, con enfoque cuantitativo, de nivel descriptivo correlacional y de diseño no experimental transversal. La población para la presente investigación está constituida por 30 (treinta) ingenieros civiles colegiados expertos en construcción y habiendo participado por lo menos dos veces en obras de edificios multifamiliares en el Distrito de Miraflores, Lima 2020, utilizándose para recolectar los datos una encuesta y el instrumento un cuestionario con 21 preguntas, las respuestas se dieron con la escala de Likert de 5 niveles. El instrumento fue validado por docentes aplicando la prueba de juicio de expertos que determinaron la suficiencia y aplicabilidad. El procesamiento de los datos se realizó aplicando el software estadístico SPSS versión 25 y Excel para la interpretar tablas y figuras. Para determinar la confiabilidad del instrumento se empleó el coeficiente alfa de Cronbach dando como resultado 0,906, concluyendo que existe una buena consistencia interna para esta escala, para la prueba de hipótesis se empleó la prueba de Chi cuadrado, de los resultados de las correlaciones de la prueba de Rho de Spearman, vemos que el coeficiente de correlación es igual a +0.717 la cual indica que el grado de la relación de las dos variables es positiva considerable muy fuerte. | es_PE |
dc.description.abstract | The following study aims to determine influence of risk management on costs and timeline usin Monte Carlo simulation of the INFINITUM - MIRAFLORES multifamily building in the period 2020. Seeking, demonstrating, how risk management influences costs and schedule, thus obtaining indices to take into account, to carry out a good prevention.
The hypothetical deductive method was applied in the study, with a quantitative approach, a correlational descriptive level and a non-experimental cross-sectional design. The population for the present investigation is constituted by 40 (thirty) collegiate civil engineers who are experts in construction and having participated at least twice in works of multifamily buildings in the District of Miraflores, Lima 2020, using a survey and the Instrument a questionnaire with 21 questions, the answers were measured with the Likert scale of 5 levels. The instrument was validated by teachers applying the expert judgment test that determined its sufficiency and applicability. The data processing was carried out by applying the statistical software SPSS version 25 and Excel to interpret tables and figures. To determine the reliability of the instrument, the Cronbach's alpha coefficient was used, giving 0.906 as a result, concluding that there is good internal consistency for this scale, for the hypothesis test the Chi-square test was used, of the results of the correlations of the Spearman's Rho test, we see that the correlation coefficient is equal to +0.717, which indicates that the degree of the relationship between the two variables is very strong and considerable positive. | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.format | application/msword | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada del Norte | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/4.0/ | * |
dc.source | Universidad Privada del Norte | es_PE |
dc.source | Repositorio Institucional - UPN | es_PE |
dc.subject | Gestión de la construcción | es_PE |
dc.subject | Método de Montecarlo | es_PE |
dc.subject | Métodos de simulación | es_PE |
dc.subject | Edificios | es_PE |
dc.subject | Simulación Montecarlo | es_PE |
dc.subject | Gestión de riesgos | es_PE |
dc.title | Influencia de la gestión de riesgos en los costos y cronograma utilizando la simulación de Montecarlo del edificio multifamiliar Infinitum – Miraflores. Lima 2020 | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.grantor | Universidad Privada del Norte. Facultad de Ingeniería | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.discipline | Ingeniería Civil | es_PE |
thesis.degree.name | Ingeniero Civil | es_PE |
dc.publisher.country | PE | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.01.01 | es_PE |
thesis.degree.program | Pregrado | es_PE |
dc.description.sede | Los Olivos | es_PE |
renati.advisor.dni | 10712728 | |
renati.advisor.orcid | https://orcid.org/0000-0003-3998-5671 | es_PE |
renati.author.dni | 43791190 | |
renati.author.dni | 45303234 | |
renati.discipline | 732016 | es_PE |
renati.juror | Quesada Llanto, Julio | |
renati.juror | Canta Honores, Jorge Luis | |
renati.juror | Sagastegui Vasquez, German | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |