Mostrar el registro sencillo del ítem

dc.contributor.advisorVildoso Flores, Alejandro
dc.contributor.authorChoton Camacho, Juan Junior
dc.contributor.authorVicuña Apolinario, Marco Antonio
dc.date.accessioned2021-12-15T21:39:40Z
dc.date.available2021-12-15T21:39:40Z
dc.date.issued2021-11-16
dc.identifier.citationChoton, J. J., & Vicuña, M. A. (2021). Influencia de la gestión de riesgos en los costos y cronograma utilizando la simulación de Montecarlo del edificio multifamiliar Infinitum – Miraflores. Lima 2020 [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://repositorio.upn.edu.pe/handle/11537/29143es_PE
dc.identifier.other624.92 CHOT 2021es_PE
dc.identifier.urihttps://hdl.handle.net/11537/29143
dc.description.abstractEl siguiente estudio tiene como objetivo determinar la influencia de la gestión de riesgos en los costos y cronograma utilizando la simulación de Montecarlo del edificio multifamiliar INFINITUM – MIRAFLORES en el periodo 2020. Buscando, demostrar, como la gestión de riesgos influencia en los costos y cronograma, obteniendo de esa manera índices a tener en cuenta, para realizar una buena prevención. En el estudio se aplicó el método hipotético deductivo, con enfoque cuantitativo, de nivel descriptivo correlacional y de diseño no experimental transversal. La población para la presente investigación está constituida por 30 (treinta) ingenieros civiles colegiados expertos en construcción y habiendo participado por lo menos dos veces en obras de edificios multifamiliares en el Distrito de Miraflores, Lima 2020, utilizándose para recolectar los datos una encuesta y el instrumento un cuestionario con 21 preguntas, las respuestas se dieron con la escala de Likert de 5 niveles. El instrumento fue validado por docentes aplicando la prueba de juicio de expertos que determinaron la suficiencia y aplicabilidad. El procesamiento de los datos se realizó aplicando el software estadístico SPSS versión 25 y Excel para la interpretar tablas y figuras. Para determinar la confiabilidad del instrumento se empleó el coeficiente alfa de Cronbach dando como resultado 0,906, concluyendo que existe una buena consistencia interna para esta escala, para la prueba de hipótesis se empleó la prueba de Chi cuadrado, de los resultados de las correlaciones de la prueba de Rho de Spearman, vemos que el coeficiente de correlación es igual a +0.717 la cual indica que el grado de la relación de las dos variables es positiva considerable muy fuerte.es_PE
dc.description.abstractThe following study aims to determine influence of risk management on costs and timeline usin Monte Carlo simulation of the INFINITUM - MIRAFLORES multifamily building in the period 2020. Seeking, demonstrating, how risk management influences costs and schedule, thus obtaining indices to take into account, to carry out a good prevention. The hypothetical deductive method was applied in the study, with a quantitative approach, a correlational descriptive level and a non-experimental cross-sectional design. The population for the present investigation is constituted by 40 (thirty) collegiate civil engineers who are experts in construction and having participated at least twice in works of multifamily buildings in the District of Miraflores, Lima 2020, using a survey and the Instrument a questionnaire with 21 questions, the answers were measured with the Likert scale of 5 levels. The instrument was validated by teachers applying the expert judgment test that determined its sufficiency and applicability. The data processing was carried out by applying the statistical software SPSS version 25 and Excel to interpret tables and figures. To determine the reliability of the instrument, the Cronbach's alpha coefficient was used, giving 0.906 as a result, concluding that there is good internal consistency for this scale, for the hypothesis test the Chi-square test was used, of the results of the correlations of the Spearman's Rho test, we see that the correlation coefficient is equal to +0.717, which indicates that the degree of the relationship between the two variables is very strong and considerable positive.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/4.0/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectGestión de la construcciónes_PE
dc.subjectMétodo de Montecarloes_PE
dc.subjectMétodos de simulaciónes_PE
dc.subjectEdificioses_PE
dc.subjectSimulación Montecarloes_PE
dc.subjectGestión de riesgoses_PE
dc.titleInfluencia de la gestión de riesgos en los costos y cronograma utilizando la simulación de Montecarlo del edificio multifamiliar Infinitum – Miraflores. Lima 2020es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Civiles_PE
thesis.degree.nameIngeniero Civiles_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeLos Olivoses_PE
renati.advisor.dni10712728
renati.advisor.orcidhttps://orcid.org/0000-0003-3998-5671es_PE
renati.author.dni43791190
renati.author.dni45303234
renati.discipline732016es_PE
renati.jurorQuesada Llanto, Julio
renati.jurorCanta Honores, Jorge Luis
renati.jurorSagastegui Vasquez, German
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess