Mostrar el registro sencillo del ítem

dc.contributor.advisorLuján López, Jorge Eduardo
dc.contributor.authorFernandez Lazaro, Delmer Dante
dc.date.accessioned2022-10-27T23:06:45Z
dc.date.available2022-10-27T23:06:45Z
dc.date.issued2022-07-14
dc.identifier.citationFernandez, D. D. (2022). Ley mínima de oro en la solución rica para una producción rentable en un proceso de recuperación de oro en una empresa minera [Tesis de maestría, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/31617es_PE
dc.identifier.other658.1554 FERN 2022es_PE
dc.identifier.urihttps://hdl.handle.net/11537/31617
dc.description.abstractEl presente estudio tuvo como objetivo general, determinar la ley mínima de oro en la solución rica (SR) para una producción rentable en un proceso de recuperación de oro en una empresa minera. Para este estudio se consideró información una empresa minera ubicada en el departamento de Cajamarca. La información de las leyes de oro ha sido obtenida del periodo 2016 al 2021, y la información de costos se consideró del año 2018. En el presente trabajo la población constó de cuatro sectores del Pad de lixiviación, y para la muestra, en base a un muestreo por conveniencia, se consideró al sector N°2 del Pad. El tipo de investigación fue no experimental, cuantitativo – aplicada y longitudinal, y con un nivel descriptivo. En la presente investigación, se consideró los dos procesos de recuperación de oro que se utiliza en dicha minera: Merrill Crowe (MC) y Carbón en Columnas (CIC). Para ambos procesos se determinó su ley mínima de oro, con el fin de determinar, cual de dichos procesos es más rentable. Los resultados concluyen que: La ley mínima de oro en la solución rica para procesar la Planta MC es de 0.0365 g/m3 (rentabilidad igual a 0%), leyes menores a esta implicaría pérdidas en el proceso MC. Mientras que, la ley mínima de oro en la Solución Rica para procesar la Planta CIC es de 0.0374 g/m3 (rentabilidad igual a 0%), leyes menores a esta implicarían pérdidas con el proceso CIC. Así mismo, referente a la rentabilidad, se determinó que el proceso MC tiene mayor rentabilidad que el proceso CIC. A lo que diremos, a una ley en la SR de 0.333 g/m3, en el MC se obtiene rentabilidades 27 % más que con el proceso CIC. En cuanto al momento adecuado para el cierre del Pad de lixiviación, y una vez colocadas las últimas onzas de oro en el Pad, el cierre ha sido determinado luego de 3.7 meses para un proceso MC, y luego de 3.6 meses para el proceso CIC.es_PE
dc.description.abstractThe general objective of this study was to determine the minimum gold grade in the rich solution (SR), for profitable production in a gold recovery process in a mining company. For this study, information from a mining company located in the department of Cajamarca was considered. The information on the gold grades has been obtained from the period 2016 to 2021, and the cost information was considered from the year 2018. In the present work, the population consisted of four sectors of the leaching Pad, and for the sample, based on convenience sampling, sector N° 2 of the Pad was considered. The type of research is non-experimental, quantitative - applied and longitudinal, and with a descriptive level. In the present investigation, the two gold recovery processes used in said mining were considered: Merrill Crowe (MC) and Carbon in Columns (CIC). For both processes, their minimum gold grade was determined, in order to determine which of these processes is more profitable. The results conclude that: The minimum gold grade in the rich solution to process the MC Plant is 0.0365 g/m3 (profitability equal to 0%), grades lower than this would imply losses in the MC process. While the minimum gold grade in the rich solution to process the CIC Plant is 0.0374 g/m3 (profitability equal to 0%), grades lower than this would imply losses with the CIC process. Likewise, regarding profitability, it was determined that the MC process has higher profitability than the CIC process. To what we will say, at a grade in the SR of 0.333 g/m3, in the MC, returns are obtained 27% more than with the CIC process. Regarding the right time for the closure of the leach Pad, and once the last ounces of gold have been placed in the pad, the closure has been determined after 3.7 months for a MC process, and after 3.6 months for the CIC process.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/embargoedAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectRentabilidades_PE
dc.subjectMetalurgiaes_PE
dc.subjectLixiviaciónes_PE
dc.subjectLey mínima de oroes_PE
dc.subjectSolución ricaes_PE
dc.subjectProducción rentablees_PE
dc.subjectProceso de recuperación de oroes_PE
dc.subjectPades_PE
dc.subjectMinimum gold gradees_PE
dc.subjectRich solutiones_PE
dc.subjectProfitable productiones_PE
dc.subjectGold recovery processes_PE
dc.titleLey mínima de oro en la solución rica para una producción rentable en un proceso de recuperación de oro en una empresa mineraes_PE
dc.typeinfo:eu-repo/semantics/masterThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Escuela de Posgrado y Estudios Continuoses_PE
thesis.degree.levelMaestroes_PE
thesis.degree.disciplineMaestría en Administración de Empresas, Modalidad Internacional Global Executive MBAes_PE
thesis.degree.nameMaestro en Administración de Empresas, Modalidad Internacional Global Executive MBAes_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#5.02.04es_PE
thesis.degree.programPosgradoes_PE
dc.description.sedeTrujillo El Molinoes_PE
renati.advisor.dni17897692
renati.advisor.orcidhttps://orcid.org/0000-0003-1208-1242es_PE
renati.author.dni17982172
renati.discipline413917es_PE
renati.jurorSagastegui Cruz, Julia Otilia
renati.jurorRojas Ciudad, Carlos Alberto
renati.jurorGonzalez Otoya, Ana Teresa La Rosa
renati.levelhttps://purl.org/pe-repo/renati/level#maestroes_PE
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem