Mostrar el registro sencillo del ítem

dc.contributor.advisorNeyra Torres, Jose Luis
dc.contributor.authorSegura Castañeda, Jorge Luis
dc.contributor.authorTapia Sullca, Jenifer Marina Teresa
dc.date.accessioned2023-07-25T17:22:27Z
dc.date.available2023-07-25T17:22:27Z
dc.date.issued2023-07-19
dc.identifier.citationSegura, J. L., & Tapia, J. M. (2022). Optimización de costos en obra mediante la reducción de plazos de desencofrado al aumentar resistencia inicial de concreto, Ica, 2022 [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/33868es_PE
dc.identifier.other620.112 SEGU 2022es_PE
dc.identifier.urihttps://hdl.handle.net/11537/33868
dc.description.abstractLa presente investigación busca optimizar los costos en obra mediante la reducción de plazos de desencofrado al aumentar resistencia inicial del concreto de 175kg/cm2 a 210 kg/cm2 y 245kg/cm2, en los costos de desencofrado de elementos horizontales (losas macizas) en una obra realizada durante dos etapas en la ciudad de Ica durante el año 2022, de las que el estudio corresponde a la segunda etapa, para esto se propuso llevar a cabo una metodología cuasi experimental, cuantitativa, de alcance trasversal donde se analizaron los costos asociados a partidas y costos que eran impactos en el aumento de la resistencia del concreto en comparación con los ahorros presentados en la disminución del tiempo de alquiler de material de encofrado metálico para la obra. Obteniéndose a través de los resultados que lo investigado constituye una generalidad para la obra en estudio, puesto que, en la segunda etapa estudiada de la obra, se encontró un ahorro considerable al realizar la sustitución del concreto, cuando se aumentó la resistencia en las losas. Para el concreto f´c=175 kg/cm2 y 28 días de encofrado se obtuvo un presupuesto global de S/.649,002.46, para f´c=210 kg/cm2 y 28 días de encofrado, S/.650,003.06 y para f´c=245 kg/cm2 y 7 días de encofrado el total ascendió hasta S/.176,634.24. Finalmente se concluyó que, si bien los costos de obra aumentaron un 12% en cuanto al costo del concreto, por otro lado, disminuyó un 25% del costo total en tiempo de desencofrado de elementos horizontales, suponiendo un ahorro considerable en la obra.es_PE
dc.description.abstractThe present investigation seeks to optimize the costs on site by reducing the stripping times by increasing the initial resistance of the concrete from 175kg/cm2 to 210 kg/cm2 and 245kg/cm2, in the stripping costs of horizontal elements (solid slabs) in a work carried out during two stages in the city of Ica during the year 2022, of which the study corresponds to the second stage, for this it was proposed to carry out a quasi-experimental, quantitative, cross-sectional methodology where the costs associated with items and costs that were impacts on the increase in the resistance of the concrete in comparison with the savings presented in the decrease in the rental time of metallic formwork material for the work. Obtaining through the results that what was investigated constitutes a generality for the work under study, since, in the second stage studied of the work, considerable savings were found when replacing the concrete, when the resistance in the slabs was increased. For concrete f'c=175 kg/cm2 and 28 days of formwork, a global budget of S/.649,002.46 was obtained, for f'c=210 kg/cm2 and 28 days of formwork, S/.650,003.06 and for f' c=245 kg/cm2 and 7 days of formwork the total amounted to S/.176,634.24. Finally, it was concluded that, although the construction costs increased by 12% in terms of the cost of concrete, on the other hand, the total cost in stripping time of horizontal elements decreased by 25%, representing considerable savings in the work.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/restrictedAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectControl de gestiónes_PE
dc.subjectResistencia de materialeses_PE
dc.subjectConcreto armadoes_PE
dc.subjectEncofradoes_PE
dc.subjectResistenciaes_PE
dc.subjectElementos horizontales de concretoes_PE
dc.subjectCostoses_PE
dc.subjectFormworkes_PE
dc.subjectResistancees_PE
dc.subjectHorizontal concrete elementses_PE
dc.subjectCostses_PE
dc.titleOptimización de costos en obra mediante la reducción de plazos de desencofrado al aumentar resistencia inicial de concreto, Ica, 2022es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Civiles_PE
thesis.degree.nameIngeniero Civiles_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeBreñaes_PE
renati.advisor.dni21454204
renati.advisor.orcidhttps://orcid.org/0000-0002-6470-2998es_PE
renati.author.dni45092588
renati.author.dni46789195
renati.discipline732016es_PE
renati.jurorVereau Miranda, Edmundo
renati.jurorRabanal Chávez, Erick Humberto
renati.jurorCampos Vásquez, Neicer
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
dc.relation.conformsto1%es_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem