Mostrar el registro sencillo del ítem

dc.contributor.advisorSiveroni Morales, José Alfredo
dc.contributor.authorLlaique Nuñoncca, Ángel Antonio
dc.contributor.authorSánchez Guevara, William Orlando
dc.date.accessioned2015-10-21T13:02:21Z
dc.date.available2015-10-21T13:02:21Z
dc.date.issued2015-06-01
dc.identifier.citationLlaique, A. A., & Sánchez, W. O. (2015). Propuesta para implementar un sistema de gestión de seguridad y salud ocupacional en el proyecto minero Hauyrapongo San Bernardino - Cajamarca 2015 (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/5284es_PE
dc.identifier.otherTES 622 LLAI 2015es_PE
dc.identifier.urihttps://hdl.handle.net/11537/5284
dc.description.abstractLa investigación fue realizada en Mina Modelo ubicada en el departamento de Cajamarca, en labores de desarrollo, preparación y en tajos, en la perforación de rocas. La investigación tiene como objetivo principal determinar el Costo Total de Perforación (TDC), que permita la optimización de esta operación unitaria en Mina Modelo. Las pruebas de campo se realizaron en diferentes tajos de la mina. Los equipos y herramientas que se utilizaron son perforadoras de modelo PIT Viper 271 de la marca Atlas Copco y brocas tricónicas PDB Tools Inc. de diámetro 10 5/8” cuyos Modelos son EX 722 (para terreno duro), EX 712 (para terreno medio), EX 532 (para terreno medio a suave), que son materia de estudio de esta investigación durante el año 2012 – 2013. Para realizar las pruebas de campo con las brocas tricónicas, fue necesario conocer el estado de los principales sistemas de estas nuevas perforadoras en las cuales se hicieron mediciones de presión de aire y de peso (pulldown), para de esta manera corroborar si están en la capacidad de perforar con un diámetro de 10 5/8”, lo cual es materia de estudio. La investigación analizó y evaluó una muestra de doce perforaciones aleatorias con los diferentes modelos de brocas, líneas arriba mencionadas para determinar la reducción del costo total de perforación (TDC); esto se logró con las nuevas tecnologías de brocas, las cuales son más resistentes al incremento significativo de la velocidad de penetración, además se suma a ello la correcta aplicación de los parámetros de perforación, reduciendo al TDC en 21.42% y 19.45% en terrenos duros y medio a suave respectivamente. Por lo tanto estos modelos de brocas han dado buenos resultados, sobre todo en terrenos duros, ya que este presenta el costo más alto.es_PE
dc.description.abstractThis research was realized in Pattern Mine located in the Cajamarca city, in the development of this work, preparation and in the pits, which respect at the drilling of rocks. The research has as main objective to determine the Total Drilling Cost (TDC), which allows the optimization of this unit operation in Pattern Mine. Field tests were realized in different pits of the mine, following the schedule, without hampering or delaying the production of the mine. The equipment and tools were used drills PIT Viper 271 from brand Atlas Copco and tricone bits PDB Tools Inc. diameter 10 5/8” whose models are EX 722 (for hard ground), EX 712 (for middle ground ), EX 532 (for medium to soft ground), which is subject of this research during the year 2012-2013. To perform field tests with tricone bits, it was necessary to know the state of the main systems of these new drills, in which we were measured the air pressure and weight (pulldown), to confirm corroborate if they are able to drill with a diameter of 10 5/8”, which is the subject of study. The research analyzed and tested a random sample of twelve holes with different models of bits, that we were mentioned lines above, to determine the reduction of total cost of drilling (TDC); this was achieved with the new technologies of bits, which are more resistant to increase significantly of the penetration speed, it also adds the proper application of the drilling parameters, reducing the TDC at 21.42% and 19.45% on hard ground medium and soft respectively. Therefore, these models have been successful drills, especially on hard ground, as this has the highest cost.es_PE
dc.description.uriTesises_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de Américaes_PE
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceRepositorio Institucional - UPNes_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.subjectExcavacioneses_PE
dc.subjectCostoses_PE
dc.subjectPerforadoras de rocases_PE
dc.subjectIndustria mineraes_PE
dc.subjectMinases_PE
dc.subjectIngeniería de Minases_PE
dc.titleDeterminación del costo total de perforación para optimizar esta operación unitaria en mina modelo a tajo abierto, Cajamarca - Perú, 2015es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería de Minases_PE
thesis.degree.nameIngeniero de Minases_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.07.05es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeCajamarcaes_PE
renati.advisor.dni22066533
renati.discipline724026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess