Mostrar el registro sencillo del ítem
Planificación de requerimientos de materiales (MRP) como mejora en la productividad de la empresa Fénix Maquinarias S.A.C. Trujillo, octubre 2016 – junio 2017
dc.contributor.advisor | Wong Aitken, Higinio Guillermo | |
dc.contributor.author | Vidal Cava, Carol Toshiro | |
dc.date.accessioned | 2017-11-30T15:15:56Z | |
dc.date.available | 2017-11-30T15:15:56Z | |
dc.date.issued | 2017-10-13 | |
dc.identifier.citation | Vidal, C. T. (2017). Planificación de requerimientos de materiales (MRP) como mejora en la productividad de la empresa Fénix Maquinarias S.A.C. Trujillo, octubre 2016 – junio 2017 (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/12388 | es_PE |
dc.identifier.other | 658.5 VIDA | es_PE |
dc.identifier.uri | https://hdl.handle.net/11537/12388 | |
dc.description.abstract | RESUMEN: El presente trabajo se realizó con el objetivo de medir la influencia de la Planificación de Requerimientos de Materiales (MRP) en la productividad de la empresa FÉNIX MAQUINARIAS S.A.C., en la ciudad de Trujillo durante los meses de octubre 2016 hasta junio del 2017. Para ello, se realizó un diagnóstico de productividad en el negocio sobre la base de la producción y los recursos utilizados desde 2013 hasta agosto de 2016 para conocer la realidad con datos precisos de los problemas actuales de la empresa FÉNIX MAQUINARIAS S.A.C. La investigación es de tipo experimental de diseño pre experimental. Luego, procedimos a implementar la herramienta MRP (Material Requirement Planning). Recopilación de materiales de información necesarios para la fabricación de las tres máquinas principales que fueron elegidas por grado de importancia, demanda y representatividad de la empresa, organizándose dentro de la estructura de materiales, etc. La Planificación de Requerimientos de Materiales (MRP) se aplicó en base a las tres maquinarias representantes a partir del 1 de octubre del 2016 y finalizó el 30 de junio del año 2017. Después de nueve meses de aplicación, los resultados fueron: Las paradas de producción debido a falta de materiales fueron nulas. La productividad total en la fabricación aumentó en 11% Y como otros resultados, se apreció que se reduciría costos debido a que la empresa FÉNIX MAQUINARIAS S.A.C. podía realizar pedidos de materiales en pequeños lotes. | es_PE |
dc.description.abstract | ABSTRACT: The present paper was carried out with the objective of measuring the influence of Material Requirements Planning (MRP) on the productivity of the company FÉNIX MAQUINARIAS S.A.C., in the city of Trujillo during the months of October 2016 to June 2017. To do it, was made a diagnosis of productivity in the business on the basis of production and resources used from 2013 until august 2016 for to know the reality with accurate data current problems of the company FÉNIX MAQUINARIAS S.A.C. The research is pre experimental design applicative type. Then, we proceeded to implement the tool Material Requirements Planning (MRP). Gathering information materials required to manufacture the three main machines that were chosen by degree of importance, demand and representative for the company, organizing within the structure of materials, etc. The Material Requirements Planning (MRP) was applied based on the three representative machinery from October 1, 2016 and ended on June 30, 2017. After nine months of application, the results were: The production stops due to lack of materials were null. Productivity in the manufacture increased on 11%. And like other results, it was appreciated that it would reduce costs because the company FÉNIX MAQUINARIAS S.A.C. could make orders of materials in small batches. | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada del Norte | es_PE |
dc.rights | info:eu-repo/semantics/embargoedAccess | es_PE |
dc.source | Universidad Privada del Norte | es_PE |
dc.source | Repositorio Institucional - UPN | es_PE |
dc.subject | Tesis | es_PE |
dc.subject | Productividad | es_PE |
dc.subject | Planificación de la producción | es_PE |
dc.subject | Administración de materiales | es_PE |
dc.title | Planificación de requerimientos de materiales (MRP) como mejora en la productividad de la empresa Fénix Maquinarias S.A.C. Trujillo, octubre 2016 – junio 2017 | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.grantor | Universidad Privada del Norte. Facultad de Negocios | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.discipline | Administración | es_PE |
thesis.degree.name | Licenciado en Administración | es_PE |
dc.publisher.country | PE | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#5.02.04 | es_PE |
thesis.degree.program | Pregrado | es_PE |
dc.description.sede | Trujillo El Molino | es_PE |
renati.advisor.dni | 18160533 | |
renati.author.dni | 73198464 | |
renati.discipline | 413016 | es_PE |
renati.juror | Alfaro Sánchez, María Eugenia | |
renati.juror | D’angelo Panizo, María del Carmen | |
renati.juror | Cancino Olivera, Rossana Magally | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |
Ficheros en el ítem
Este ítem aparece en la(s) siguiente(s) colección(ones)
-
Tesis [1653]