dc.contributor.advisor | Durand Porras , Juan Carlos | |
dc.contributor.author | Alvarado Hinostroza, Miguel | |
dc.contributor.author | Macedo Geronimo, Edgar | |
dc.date.accessioned | 2017-12-06T14:16:42Z | |
dc.date.available | 2017-12-06T14:16:42Z | |
dc.date.issued | 2017-07-11 | |
dc.identifier.citation | Alvarado, M., & Macedo, E. (2017). Influencia de la disposición de planta en la productividad de spools de la empresa metalmecánica Fima, 2016 (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/12482 | es_PE |
dc.identifier.other | 670.503 ALVA/H 2017 | es_PE |
dc.identifier.uri | https://hdl.handle.net/11537/12482 | |
dc.description.abstract | RESUMEN
La presente investigación nace de la necesidad de mejorar los procesos productivos y
elevar la productividad de la empresa, para esto un factor fundamental es la disposición de
planta con una adecuada utilización de los espacios, factor que menos atención le prestan
en las empresas metalmecánicas.
La presente investigación tiene como objetivo principal determinar la correlación e
influencia que existe de la disposición de planta (DP) en la productividad en la fabricación
de spool en una empresa metalmecánica, buscando mejoras en el proceso de producción
de la empresa.
Determinado los procesos de fabricación de spool se priorizaron las causas que
origina el problema en estudio para seleccionar herramientas de mejora como System
Layout Planning (SLP), así como algunas herramientas de manufactura esbelta como 5 S,
Kanban, Jidoka y Andon para combinarlos tratando de mitigar dichas causas principales.
A continuación, se realizó una evaluación técnica y económica mostrando los
resultados del impacto de aplicar estas herramientas, se obtuvo así un incremento del 92%
con respecto al actual (993 m2) en la utilización efectiva de espacios de la planta gracias
a una nueva DP., en cuanto a la productividad del área de spool en general se incrementó
en un 13%, en la sección de ensamble se incrementó en un 9%, en la sección de soldadura
la productividad experimenta un incremento del 13%, en la sección de QC la productividad
se elevó en un 14%; así mismo las técnicas financieras como TIR (61%), VAN ($ 2 396.37),
B/C (1.6), mostrando la viabilidad de un proyecto de implementación de una nueva DP para
el área de spool.
Finalmente se expone las conclusiones de esta propuesta de implementación de
una nueva DP, y las recomendaciones para el mantenimiento y sostenibilidad de esta
implementación. | es_PE |
dc.description.abstract | ABSTRACT
This work stems from the need to improve production processes and increase productivity
of the company, a key factor for this is the plant layout with proper use of space, less
attention factor that lend you in the metalworking companies.
The main objective of this work is to determine the relationship between the plant
layout (DP) and productivity in manufacturing spool in an engineering company, which must
serve to consider proposals for improvements in the production process of the company.
Determining spool manufacturing process prioritized to know the causes of the
problem to select enhancement tools such as System Layout Planning (SLP), as well as
some lean manufacturing tools like 5S, Kanban, Jidoka, and Andon to mixing it, trying to
mitigate these main causes.
Then, a technical and economic evaluation was carried out showing the results of
the impact of applying these tools, thus achieving a 92% increase over the current (993 m2)
in the effective use of plant spaces thanks to a new DP. As for the productivity of the spool
area in general increase by 13%, in the assembly section increase by 9%, in the welding
section productivity experienced an increase of 13%, in the section of QC productivity rose
by 14%; As well as financial techniques such as TIR (61%), VAN ($ 1 805.03), B/C (1.6),
showing the feasibility of a project to implement a new DP for the spool area.
Finally, this work exposed the conclusions that this proposal of implement a new DP
would have, like so recommendations for maintenance and sustainability of this
implementation. | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.format | application/msword | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada del Norte | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.source | Universidad Privada del Norte | es_PE |
dc.source | Repositorio Institucional - UPN | es_PE |
dc.subject | Procesos industriales | es_PE |
dc.subject | Productividad | es_PE |
dc.subject | Metalurgia | es_PE |
dc.title | Influencia de la disposición de planta en la productividad de spools de la empresa metalmecánica Fima, 2016 | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.grantor | Universidad Privada del Norte. Facultad de Ingeniería | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.discipline | Ingeniería Industrial | es_PE |
thesis.degree.name | Ingeniero Industrial | es_PE |
dc.publisher.country | PE | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | es_PE |
thesis.degree.program | Pregrado | es_PE |
dc.description.sede | Los Olivos | es_PE |
renati.advisor.dni | 09953115 | |
renati.advisor.orcid | https://orcid.org/0000-0002-8400-5006 | es_PE |
renati.author.dni | 21564339 | |
renati.author.dni | 43040889 | |
renati.discipline | 722026 | es_PE |
renati.juror | Vidal Castañeda, Hans Clive | |
renati.juror | Ortega Saco, Juan Alejandro | |
renati.juror | Sicos Peñaloza, Carlos Alberto | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |