dc.contributor.advisor | Rodríguez Alza, Miguel Ángel | |
dc.contributor.author | Miranda Álvarez, Diana | |
dc.date.accessioned | 2018-02-12T17:07:50Z | |
dc.date.available | 2018-02-12T17:07:50Z | |
dc.date.issued | 2017-02-12 | |
dc.identifier.citation | Miranda, D. (2017). Propuesta de implementación de herramientas de ingeniería para la reducción de costos logísticos en la fabricación de semirremolques en la empresa Global System Industry S. A. C. [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/12772 | es_PE |
dc.identifier.other | 670.785 MIRA 2017 | es_PE |
dc.identifier.uri | https://hdl.handle.net/11537/12772 | |
dc.description.abstract | Se realizó un trabajo de investigación en el campo de la ingeniería industrial con el
propósito de determinar el impacto de la propuesta de implementación de herramientas de
ingeniería para la reducción de costos logísticos en la fabricación de semirremolques en
la empresa Global System Industry S.A.C. Para el desarrollo de la investigación se realizó
un diagnóstico de la situación actual de la empresa en el área de Logística del proceso de
fabricación de un Semirremolque Plataforma Neumática 13.5 metros, el cual está
ocasionando altos costos en la empresa.
Mediante análisis de Pareto se priorizaron las causas raíces y se monetizaron las pérdidas
económicas; la propuesta se diseñó en función a las causas y las pérdidas encontradas.
La propuesta de implementación contiene procedimientos estandarizados y formatos
logísticos que permiten controlar los procesos. Adicionalmente en el trabajo aplicativo se
explica a detalle el proceso de Compra, Almacenamiento y Distribución. La propuesta de
implementación cuenta con las herramientas de ingeniería como BOM (Lista de
Requerimiento de Materiales), Gestión por Procesos, Plan de Capacitación, Kardex, 5”S”
y Codificación
Finalmente, con toda la información recolectada a partir del diagnóstico, se presenta un
análisis de los resultados y una discusión para corroborar los datos cuantitativos y la mejora
lograda con la propuesta de implementación para la reducción de costos logísticos en la
fabricación de semirremolques en la empresa.
Al desarrollar la propuesta se obtuvo un beneficio de S/. 32,768.75. Al realizar la evaluación
económica y financiera se obtuvo un VAN de S/. 41,142.71 y un TIR de 62.91% y una
relación Beneficio / Costo de 1.7
Se concluye que la Propuesta de implementación de herramientas de ingeniería reduce los
costos logísticos en la fabricación de semirremolques en la empresa GLOBAL SYSTEM
INDUSTRY S.A.C. | es_PE |
dc.description.abstract | A research work was carried out in the field of industrial engineering with the purpose of
determining the impact of the proposed implementation of engineering tools for the
reduction of logistics costs in the manufacture of semi-trailers in the company Global
System Industry S.A.C. For the development of the investigation, a diagnosis of the current
situation of the company in the Logistics area of the manufacturing process of a Pneumatic
Platform Semi-trailer 13.5 meters was made, which is causing high costs in the company.
Through Pareto analysis, root causes were prioritized and economic losses were
monetized; the proposal was designed according to the causes and the losses found.
The implementation proposal contains standardized procedures and logistic formats that
allow to control the processes. Additionally, in the application work, the Purchase, Storage
and Distribution process is explained in detail. The implementation proposal has the
engineering tools such as BOM (Materials Requirement List), Process Management,
Training Plan, Kardex, 5 "S" and Coding.
Finally, with all the information collected from the diagnosis, we present an analysis of the
results and a discussion to corroborate the quantitative data and the improvement achieved
with the implementation proposal for the reduction of logistics costs in the manufacture of
semi-trailers in the company.
A benefit of S /. 32,768.75 was obtained in the developing of the proposal. When carrying
out the economic and financial evaluation, a NPV of S /. 41,142.71 and an IRR of 62.91%
and a Benefit / Cost ratio of 1.7
It is concluded that the Proposal for the implementation of engineering tools reduces the
logistics costs in the manufacture of semi-trailers in the company GLOBAL SYSTEM
INDUSTRY S.A.C. | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada del Norte | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights | Atribución-NoComercial-CompartirIgual 3.0 Estados Unidos de América | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/us/ | * |
dc.source | Universidad Privada del Norte | es_PE |
dc.source | Repositorio Institucional - UPN | es_PE |
dc.subject | Administración de materiales | es_PE |
dc.subject | Logística | es_PE |
dc.subject | Procesos industriales | es_PE |
dc.title | Propuesta de implementación de herramientas de ingeniería para la reducción de costos logísticos en la fabricación de semirremolques en la empresa Global System Industry S. A. C. | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.grantor | Universidad Privada del Norte. Facultad de Ingeniería | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.discipline | Ingeniería Industrial | es_PE |
thesis.degree.name | Ingeniero Industrial | es_PE |
dc.publisher.country | PE | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | es_PE |
thesis.degree.program | Pregrado | es_PE |
dc.description.sede | Trujillo San Isidro | es_PE |
renati.advisor.dni | 18081624 | |
renati.advisor.orcid | https://orcid.org/0000-0002-1939-5343 | es_PE |
renati.author.dni | 73622115 | |
renati.discipline | 722026 | es_PE |
renati.juror | Baca López, Marcos Gregorio | |
renati.juror | Goicochea Ramírez, Oscar Alberto | |
renati.juror | Mas Mc Gowen, Ramiro Fernando | |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |