Mostrar el registro sencillo del ítem

dc.contributor.advisorDurand Porras, Juan Carlos
dc.contributor.authorRomero Ríos, Percy Marcial
dc.date.accessioned2021-10-11T23:17:05Z
dc.date.available2021-10-11T23:17:05Z
dc.date.issued2021-06-04
dc.identifier.citationRomero, P. M. (2021). Metodología de simulación con inteligencia artificial en la planificación y control de la producción, en sistemas de manufactura de fundición [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/28067es_PE
dc.identifier.other658.5ROME 2021es_PE
dc.identifier.urihttps://hdl.handle.net/11537/28067
dc.description.abstractEl estudio realizado bajo la modalidad de tesis tuvo como objetivo general determinar cómo una metodología de Simulación con Inteligencia Artificial permite ayudar en la Planificación y Control de la Producción, en sistemas de Manufactura de Fundición. Dicha metodología utiliza las redes neuronales artificiales (RNA) para pronosticar los costos de parada de la línea trefiladora del área de producción, se eligió esta metodología para dar respuesta a un problema de la empresa, en la que se detectó altas paradas de la línea trefiladora. Para el diagnóstico del problema se recurrió a él diagrama de Ishikawa y diagrama de Pareto, identificando en la línea los equipos que generan horas altas de parada, para luego proceder a la aplicación de una metodología basado en Redes Neuronales Artificiales en el pronóstico del costo de parada. Se utilizo la herramienta Neural Net Works de Matlab para la fase de topología, configuración, aprendizaje, entrenamiento y pronostico basados en la RNA Perceptrón Multicapa. Los resultados de la investigación permitieron determinar el resultado de pronóstico del costo de parada, con un error de la RNA de 13.86%, que es menor obtenido por el experto que fue de 37.08% con respecto a los montos reales. Con los tiempos de parada de línea obtenidos atreves del pronóstico en los meses de marzo, abril, mayo y junio del 2019, se propone un plan de mantenimiento autónomo que reduzca en un 30% los tiempos de parada de la línea, lo cual aumentaría la producción en marzo, en 6.327tn, para abril en 2.595tn, para mayo en 3.105tn y para junio en 5.842tn, generando ingresos adicionales en marzo con un monto de S/17,112.15, en abril de S/7,024.99, en mayo de S/8,398.46 y en junio de S/15,783.71 del 2019, los cuales suman un ingreso total de S/48,319.31.es_PE
dc.description.abstractThe study carried out under the modality of the thesis had as a general objective to determine how a Simulation methodology with Artificial Intelligence allows to help in the Planning and Control of Production, in Foundry Manufacturing systems. This methodology uses artificial neural networks (ANN) to forecast the shutdown costs of the drawing line in the production area, this methodology was chosen to respond to a problem of the company, in which high stops of the drawing line were detected . For the diagnosis of the problem, the Ishikawa diagram and Pareto diagram were used, identifying on the line the equipment that generate high stop hours, and then proceed to the application of a methodology based on Artificial Neural Networks in the forecast of the cost of stop. The Neural Net Works tool from Matlab was used for the topology, configuration, learning, training and forecasting phase based on the Multilayer Perceptron RNA. The results of the investigation allowed determining the forecast result of the shutdown cost, with an error of the ANN of 13.86%, which is lower than obtained by the expert, which was 37.08% with respect to the real amounts. With the line stop times obtained through the forecast in the months of March, April, May and June 2019, an autonomous maintenance plan is proposed that reduces line stop times by 30%, which would increase the production in March, in 6,327tn, for April in 2,595tn, for May in 3,105tn and for June in 5,842tn, generating additional income in March with an amount of S / 17,112.15, in April of S / 7,024.99, in May of S /8,398.46 and in June of S / 15,783.71 of 2019, which add up to a total income of S / 48,319.31.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de América*
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectProducciónes_PE
dc.subjectCostos de producciónes_PE
dc.subjectTiempo de paradaes_PE
dc.subjectRedes neuronales artificialeses_PE
dc.subjectRentabilidades_PE
dc.titleMetodología de simulación con inteligencia artificial en la planificación y control de la producción, en sistemas de manufactura de fundiciónes_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeLos Olivoses_PE
renati.advisor.dni09953115
renati.advisor.orcidhttps://orcid.org/0000-0002-8400-5006es_PE
renati.author.dni40191733
renati.discipline722026es_PE
renati.jurorOrtega Saco, Juan Alejandro
renati.jurorPiscoya Silva, Ulises Abdon
renati.jurorRivadeneyra Cuya, Aldo Guillermo
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess