Mostrar el registro sencillo del ítem

dc.contributor.advisorCalixtro Calixtro, Wilder Alexander
dc.contributor.authorCapac Tafur, Nieves De Los Angeles
dc.contributor.authorDiaz Altez, Enrique Anselmo
dc.date.accessioned2024-07-02T22:09:16Z
dc.date.available2024-07-02T22:09:16Z
dc.date.issued2023-04-15
dc.identifier.citationCapac, N., & Diaz, E. A. (2023). Implementación de un sistema de gestión de riesgos basado en el método Smith complementado con la Guía del PMBOK sexta edición, con el fin de asegurar el cumplimiento del cronograma en la obra de vivienda multifamiliar edificio Bertello – etapa de estructuras [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/36980es_PE
dc.identifier.other.es_PE
dc.identifier.urihttps://hdl.handle.net/11537/36980
dc.description.abstractLa presente investigación se realizó debido a los constantes retrasos en la construcción de edificaciones, esto se debe a diferentes factores como técnicos, ejecución, logística, transporte, subcontratistas, proveedores, condiciones climáticas, fenómenos naturales, contractuales, legales y otros riesgos, así generando incumplimientos en el cronograma, es por ello que se está implementando un sistema de gestión de riesgo basado en el método de Smith complementado con el PMBOK para la ejecución de la vivienda multifamiliar Bertello, así identificar, analizar, planificar y controlar los riesgos, enfocándose principalmente en la etapa de estructura con el fin de cumplir con el cronograma; es por ello que se tiene como objetivo principal implementar un sistema de gestión de riesgos basada en el método Smith complementado con la guía del PMBOK sexta edición para el cumplimiento del cronograma en la obra de vivienda multifamiliar edificio Bertello, etapa de estructuras. Tiene un estudio de tipo aplicativa, con enfoque de tipo cuantitativa, nivel explicativo, diseño del tipo experimental; la muestra de estudio son todos los ingenieros y maestro de obra, y el tipo de muestreo es no probabilístico. Como resultado se obtuvo que la obra del edificio Bertello, etapa de estructuras finalizó un mes antes de lo planificado, con un costo real de S/ 645,390.39, el cual fue menor al costo planificado. Finalmente se concluye que una implementación eficaz del sistema de gestión de riesgos influye positivamente en el cumplimiento del cronograma.es_PE
dc.description.abstractThis investigation was carried out due to the constant delays in the construction of buildings, this is due to different factors such as technical, execution, logistics and transportation, subcontractors and suppliers, climatic conditions and natural, contractual and legal phenomena, other risks, thus generating non-compliance with the schedule, which is why a risk management system is being implemented based on the Smith method complemented with the PMBOK for the execution of the Bertello multifamily housing, thus identifying, analyzing, planning and controlling risks, focusing mainly in the structure stage in order to meet the schedule; it is for this reason that the main objective is to implement a risk management system based on the Smith method complemented with the PMBOK sixth edition guide for compliance with the schedule in the multifamily housing project Bertello building, structures stage. It has an application type study, with a quantitative type approach, explanatory level, experimental type design; the study sample is all engineers and foremen, and the type of sampling is non-probabilistic. As a result, it was found that the work on the Bertello building, the structures stage, ended one month earlier than planned, with a real cost of S/ 645,390.39, which was less than the planned cost. Finally, it is concluded that an effective implementation of the risk management system positively influences compliance with the schedule.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.rightsAtribución-NoComercial-CompartirIgual 3.0 Estados Unidos de América*
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/us/*
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectAdministración de proyectoses_PE
dc.subjectGestión del riesgoes_PE
dc.subjectAdministración de procesoses_PE
dc.subjectProyectos de construcciónes_PE
dc.subjectCostoses_PE
dc.subjectPMBOKes_PE
dc.subjectMétodo Smithes_PE
dc.subjectSmith methodes_PE
dc.subjectRisk managementes_PE
dc.titleImplementación de un sistema de gestión de riesgos basado en el método Smith complementado con la Guía del PMBOK sexta edición, con el fin de asegurar el cumplimiento del cronograma en la obra de vivienda multifamiliar edificio Bertello – etapa de estructurases_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Civiles_PE
thesis.degree.nameIngeniero Civiles_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeLos Olivoses_PE
renati.advisor.dni06803344
renati.advisor.orcidhttps://orcid.org/0000-0002-6423-0388es_PE
renati.author.dni71774894
renati.author.dni72939827
renati.discipline732016es_PE
renati.jurorQuesada Llanto, Julio
renati.jurorVildoso Flores, Alejandro
renati.jurorCalixtro Calixtro, Wilder
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttp://purl.org/pe-repo/renati/type#tesises_PE
dc.relation.conformsto19%es_PE


Ficheros en el ítem

Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess
Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess