dc.contributor.advisor | Oblitas Cruz, Jimy Frank | |
dc.contributor.author | Salazar Hernández, Geraldine Cristina | |
dc.contributor.author | Puma Veronica, Julio César | |
dc.date.accessioned | 2017-12-05T19:15:26Z | |
dc.date.available | 2017-12-05T19:15:26Z | |
dc.date.issued | 2017-10-04 | |
dc.identifier.citation | Salazar, G. C., & Puma, J. C. (2017). Optimización del stock de componentes críticos para reducir costos e incrementar la disponibilidad de palas hidráulicas en minería (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de http://hdl.handle.net/11537/12450 | es_PE |
dc.identifier.other | 670.787 SALA 2017 | es_PE |
dc.identifier.uri | https://hdl.handle.net/11537/12450 | |
dc.description.abstract | RESUMEN
El costo de operación por hora de las palas hidráulicas es de aproximadamente sobre los
44,000 US$, por lo que de producirse una falla en el equipo, ocasionaría perdidas por lucro
cesante tanto del equipo como el de los camiones que dejaría de cargar, el plan de atención
para estas emergencias que pueden ser programadas o correctivas, es el intercambio de los
componentes críticos mayores, donde la indisponibilidad de la maquina se ve afectada por el
tiempo de duración del mismo, dicho componente con falla pasa al taller para su reparación
que generalmente puede durar más de dos meses depende el componente.
Se ha propuesto realizar un estudio que permita mostrar a la empresa, la necesidad de
mejorar la gestión de stock actual; utilizando técnicas de clasificación, probabilidades e
información histórica de mantenimientos y cambios de componentes.
En la actualidad la solicitud de los componentes críticos sigue una distribución de probabilidad
llamada “Poisson”; la cual utiliza el tiempo de cambio de componentes recomendado por el
fabricante y el tiempo de reparación del mismo.
La metodología propuesta agrega al modelo matemático actual llamado poisson, el tiempo de
intercambio de componentes optimo en sus siglas en ingles MTBI (Mean Time Between
Interventions) en vez del recomendado por el fabricante, el cual es calculado en base a los
datos históricos de falla, además del número promedio de pedidos pendientes o en sus siglas
en ingles EBO (Expected Back Orders), resultando una reducción del inventario del 18%
equivalente a 1,051,300 dólares en comparación con la propuesta actual, obteniéndose un
VAN de $ 1,861,788 un TIR de 519% y un IR de 20.86 dólares validando el proyecto.
La optimización del stock de componentes críticos, permitirá reducir costos de inventario e
incrementar la disponibilidad de palas hidráulicas en minería.Las aportaciones de este trabajo
representan una oportunidad para mejorar y administrar activos físicos mejorando las prácticas
de negocio relevantes de las empresas en el ramo de maquinaria pesada para la industria de
minería y construcción que contribuye al incremento de la productividad y la reducción de
costos.
Podemos afirmar, que se logró generar un modelo cuantitativo que ofrece reducir costos de
inversión manteniendo la disponibilidad mecánica en el mínimo del 95% de palas hidráulicas
en minería.
Se recomienda en adelante, incluir los datos de falla de los componentes reparados, de ésta
manera mejorar la precisión del tiempo de intercambio óptimo. | es_PE |
dc.description.abstract | ABSTRACT
The hourly operating cost of hydraulic shovels is approximately US $ 44,000, so if a failure occurs
in the equipment, it would cause losses for lost profits of both the equipment and the trucks that
would stop loading, the plan of attention for these emergencies that can be programmed or
corrective, is the exchange of the major critical components, where the unavailability of the
machine is affected by the duration of the same, that component fails to pass to the workshop for
repair generally can last more than two months depends on the component.
It has been proposed to conduct a study to show the company the need to improve the current
stock management; using classification techniques, probabilities and historical information of
maintenance and component changes.
At present the request for critical components follows a probability distribution called "Poisson";
which uses the time of change of components recommended by the manufacturer and the time of
repair of the same.
The proposed methodology adds to the current mathematical model called poisson, the optimum
time interchange of MTBI (Mean Time Between Interventions) instead of the one recommended by
the manufacturer, which is calculated based on historical failure data , in addition to the average
number of orders pending or in its English initials EBO (Expected Back Orders), resulting in an
inventory reduction of 18% equivalent to 1,051,300 dollars compared to the current proposal,
obtaining a NPV of $ 1,861,788 a TIR of 519 % and an IR of $ 20.86 validating the project.
The optimization of the stock of critical components, will reduce inventory costs and increase the
availability of hydraulic shovels in mining. The contributions of this work represent an opportunity to
improve and manage physical assets improving the relevant business practices of the companies
in the field of heavy machinery for the mining and construction industry that contributes to
increased productivity and reduced costs.
We can affirm that it was possible to generate a quantitative model that offers to reduce investment
costs maintaining the mechanical availability in the minimum of 95% of hydraulic shovels in mining.
It is recommended from now on to include the fault data of the repaired components, in order to
improve the accuracy of the optimum exchange time. | es_PE |
dc.description.uri | Tesis | es_PE |
dc.format | application/pdf | es_PE |
dc.format | application/msword | es_PE |
dc.language.iso | spa | es_PE |
dc.publisher | Universidad Privada del Norte | es_PE |
dc.rights | info:eu-repo/semantics/openAccess | es_PE |
dc.rights | Atribución-NoComercial-CompartirIgual 3.0 Estados Unidos de América | es_PE |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/us/ | * |
dc.source | Universidad Privada del Norte | es_PE |
dc.source | Repositorio Institucional - UPN | es_PE |
dc.subject | Logística | es_PE |
dc.subject | Costos | es_PE |
dc.subject | Inventarios | es_PE |
dc.title | Optimización del stock de componentes críticos para reducir costos e incrementar la disponibilidad de palas hidráulicas en minería | es_PE |
dc.type | info:eu-repo/semantics/bachelorThesis | es_PE |
thesis.degree.grantor | Universidad Privada del Norte. Facultad de Ingeniería | es_PE |
thesis.degree.level | Título Profesional | es_PE |
thesis.degree.discipline | Ingeniería Industrial | es_PE |
thesis.degree.name | Ingeniero Industrial | es_PE |
dc.publisher.country | PE | es_PE |
dc.subject.ocde | https://purl.org/pe-repo/ocde/ford#2.11.04 | es_PE |
thesis.degree.program | Pregrado | es_PE |
dc.description.sede | Cajamarca | es_PE |
renati.advisor.dni | 40043738 | |
renati.author.dni | 42750080 | |
renati.author.dni | 40648789 | |
renati.discipline | 722026 | es_PE |
renati.level | https://purl.org/pe-repo/renati/level#tituloProfesional | es_PE |
renati.type | https://purl.org/pe-repo/renati/type#tesis | es_PE |