Mostrar el registro sencillo del ítem

dc.contributor.advisorJave Gutierrez, Carlos
dc.contributor.authorCéspedes Tejada, Diana Fernanda
dc.contributor.authorRojas Pérez, Franco Raúl Gerardo
dc.date.accessioned2016-09-27T16:04:24Z
dc.date.available2016-09-27T16:04:24Z
dc.date.issued2014-07-18
dc.identifier.citationCéspedes, D. F., & Rojas, F. R. (2014). Diseño de un plan de requerimiento de materiales y sistema de gestión de inventarios para reducir los costos operativos en la línea de producción de abrazaderas de la Factoría Sánchez S.A.C. (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de https://hdl.handle.net/11537/6504es_PE
dc.identifier.other670.787 CESP 2014es_PE
dc.identifier.urihttps://hdl.handle.net/11537/6504
dc.description.abstractRESUMEN El presente estudio de investigación se realizó en la empresa Factoría Sánchez S.A.C. dedicada a la fabricación de abrazaderas, el cual tuvo como propósito el diseño de un Plan de Requerimientos de Materiales y Sistema de Gestión de Inventarios para minimizar los costos operativos en la línea de producción de abrazaderas de la Factoría Sánchez S.A.C. Se inicia la investigación con un diagnóstico de la situación actual de los procesos de la empresa a través de indicadores, determinándose que se incurre en costos innecesarios por una inadecuada técnica de Programación y Planificación de Producción así como por la falta de un Sistema de Gestión de Inventarios. Habiendo identificado las oportunidades de mejora, se emplearon distintas herramientas y metodologías pertenecientes a la ingeniería industrial como Estudio de Tiempos, Clasificación ABC, Plan de Requerimiento de Materiales (MRP), Perfiles de Puesto y diversos elementos para establecer un Sistema de Inventarios. Luego de la aplicación de estas herramientas y metodologías se evalúa la propuesta, recalculando los indicadores diseñados inicialmente, para tener una medición objetiva sobre el beneficio percibido. Al aplicar el MRP y el Sistema de Gestión de Inventarios propuestos se logra reducir los costos operacionales. Finalmente, la propuesta es evaluada a través de la ingeniería económica obteniendo un VAN de S/.50979.00 y una TIR mensual de 29%.es_PE
dc.description.abstractABSTRACT This present study was made on Factoría Sanchez S.A.C, a company dedicated to manufacture of brackets, which was aimed to design a Material Requirements Plan and Inventory Management System in order to minimize operational costs related to Inventory management in Factoría Sanchez SAC. Research begins with a diagnosis of the current situation of processes using indicators that determined that unnecessary costs are being incurred by Factoria Sanchez SAC due to an improper technique of programing and production planning and by the lack of an inventory management system. Having identified opportunities for improvement, different tools and methodologies pertaining to industrial engineering were used such as study times, ABC classification, Material Requirement Plan, Job Profile and many others to establish an Inventory Management System. After the application of different tools and methodologies, results are evaluated by recalculating the indicators initially designed in order to have an objective measurement of the perceived benefit. By applying the MRP and Inventory Management System proposed, operational costs reduction is achieved. Finally, MRP and Inventory System results are evaluated through economic and financial tools. Such is the case that the project obtains a positive NPV (S/.50979) and an elevated monthly IRR (29%).es_PE
dc.description.uriTesises_PE
dc.formatapplication/mswordes_PE
dc.formatapplication/pdfes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/closedAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectControl de inventarioses_PE
dc.subjectProducciónes_PE
dc.subjectAdministración de Materialeses_PE
dc.titleDiseño de un plan de requerimiento de materiales y sistema de gestión de inventarios para reducir los costos operativos en la línea de producción de abrazaderas de la Factoría Sánchez S.A.C.es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeTrujillo San Isidroes_PE
renati.advisor.dni18180728
renati.author.dni72685209
renati.author.dni70013001
renati.discipline722026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE


Ficheros en el ítem

Thumbnail
Thumbnail

Este ítem aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del ítem