Mostrar el registro sencillo del ítem

dc.contributor.advisorPiedra Cabanillas, Fanny Emelina
dc.contributor.authorVilchez Mendo, Alexandra Mirella
dc.date.accessioned2021-01-21T22:08:14Z
dc.date.available2021-01-21T22:08:14Z
dc.date.issued2020-09-29
dc.identifier.citationVilchez, A. M. (2020). Diseño e implementación de la metodología Lean Manufacturing para incrementar la productividad en la empresa Industrias APM S.R.L. (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de https://hdl.handle.net/11537/24861es_PE
dc.identifier.other658.5 VILC 2020es_PE
dc.identifier.urihttps://hdl.handle.net/11537/24861
dc.description.abstractEl presente estudio tiene como objetivo diseñar e implementar la metodología Lean Manufacturing o manufactura esbelta que favorezca a la productividad en el área de producción de la empresa Industrias APM S.R.L., dicha empresa se dedica a la fabricación y comercialización de productos de panadería y pastelería, encontrándose ubicada en el Jirón Manuel Seoane N° 230, departamento de Cajamarca. La investigación es de tipo aplicada – nivel descriptivo, debido a que las variables no son manipuladas directamente, sino, que se han observado situaciones existentes para de esta manera recolectar los datos necesarios con el fin de determinar el comportamiento de estas. Para poder realizar la evaluación respectiva, se tomará en cuenta a cuatro de sus productos más representativos que son comercializados por la empresa: Conos Rellenos de Manjar Blanco, Bizcocho Chancay, Bizcocho Grande, Rosquitas. En primer lugar, se realizó un diagnóstico de la empresa respecto a la metodología lean Manufacturing, Seguidamente, se organizó la información y se construyeron dos Ishikawa que ayudaran a identificar las causas potenciales que existen en el área de producción, diagrama de procesos de los productos que nos permitieron a cuantificar la materia prima utilizada para la elaboración de cada producto. Luego, se aplicó las herramientas: 5’S, Kanban, Balance de Línea, TPM (mantenimiento productivo total), para la mejora de los procesos con el objetivo de incrementar la productividad y el VSM (Value Stream Mapping o Mapa de Flujo de Valor) para apoyar en la orientación de los procesos. Con el VSM se muestra la diferencia de los tiempos de producción (disminución de tiempos), se estimó un Tiempo de Valor Agregado de 328 minutos y un Tiempo de Valor No Agregado de 11 minutos. La inversión de la implementación fue de S/.59,827.50, se obtiene un VAN(S/.70,664.75), TIR(48%) y el IR(S/.1,18) y si se consigue una mejora en la producción de los Conos Rellenos de Manjar Blanco (104,17%), Bizcocho Chancay (246,46%), Bizcocho Grande (108,94%), Rosquitas (157,96%). Finalmente con las mejoras propuestas contribuyan a una mejora en los procesos y resulte un beneficio para la empresa.es_PE
dc.description.abstractThe objective of this study is to design and implement the Lean Manufacturing or lean manufacturing methodology that favors productivity in the production area of the company Industrias APM SRL, said company is dedicated to the manufacture and marketing of bakery and pastry products, being located in Jirón Manuel Seoane N ° 230, department of Cajamarca. The research is of an applied type - descriptive level, because the variables are not directly manipulated, but rather, existing situations have been observed in order to collect the necessary data in order to determine their behavior. In order to carry out the respective evaluation, four of its most representative products that are marketed by the company will be taken into account: White Manjar Stuffed Cones, Chancay Sponge Cake, Large Sponge Cake, Rosquitas. First, a diagnosis of the company was carried out regarding the lean manufacturing methodology. Subsequently, the information was organized and two Ishikawa were built to help identify the potential causes that exist in the production area, diagram of product processes that allowed us to quantify the raw material used to make each product. Then, the tools were applied: 5'S, Kanban, Line Balance, TPM (total productive maintenance), for the improvement of the processes with the aim of increasing productivity and the VSM (Value Stream Mapping or Value Flow Map) to support in the orientation of the processes. The VSM shows the difference in production times (decrease in times), an Added Value Time of 328 minutes and a Non-Added Value Time of 11 minutes were estimated. The investment of the implementation was S / .59, 827.50, obtaining a NPV (S / .70, 664.75), TIR (48%) and IR (S / .1.18) and if an improvement in the production of the White Manjar Stuffed Cones (104.17%), Chancay Sponge Cake (246.46%), Large Sponge Cake (108.94%), Rosquitas (157.96%). Finally, with the proposed improvements they contribute to an improvement in the processes and result in a benefit for the company.es_PE
dc.description.uriTesises_PE
dc.formatapplication/pdfes_PE
dc.formatapplication/mswordes_PE
dc.language.isospaes_PE
dc.publisherUniversidad Privada del Nortees_PE
dc.rightsinfo:eu-repo/semantics/openAccesses_PE
dc.sourceUniversidad Privada del Nortees_PE
dc.sourceRepositorio Institucional - UPNes_PE
dc.subjectAdministración de la producciónes_PE
dc.subjectGestión de la producciónes_PE
dc.subjectProductividades_PE
dc.subjectEmpresases_PE
dc.subjectHerramientases_PE
dc.titleDiseño e implementación de la metodología Lean Manufacturing para incrementar la productividad en la empresa Industrias APM S.R.L.es_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
thesis.degree.grantorUniversidad Privada del Norte. Facultad de Ingenieríaes_PE
thesis.degree.levelTítulo Profesionales_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.nameIngeniero Industriales_PE
dc.publisher.countryPEes_PE
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
thesis.degree.programPregradoes_PE
dc.description.sedeCajamarcaes_PE
renati.advisor.dni47602202
renati.advisor.orcidhttps://orcid.org/0000-0001-9506-2703es_PE
renati.author.dni72071945
renati.discipline722026es_PE
renati.jurorSisniegas Noriega, Karla Rossemary
renati.jurorAguilar Briones, Elmer
renati.jurorQuispe Vásquez, Luis Roberto
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE