Gestión de riesgos en los proyectos de energía de una empresa distribuidora de grupos electrógenos a través de un plan de repuesta bajo la guía del PMBOK
View/ Open
Investigación pdf
(application/pdf: 8.302Mb)
(application/pdf: 8.302Mb)
Investigación docx
(application/vnd.openxmlformats-officedocument.wordprocessingml.document: 7.767Mb)
Embargado hasta el 13/03/2074
(application/vnd.openxmlformats-officedocument.wordprocessingml.document: 7.767Mb)
Embargado hasta el 13/03/2074
Date
2023-10-09Author(s)
Caceres Gallegos, Karen Cynthia
Metadata
Show full item recordAbstract
La presente investigación abordó la gestión de riesgos en un proyecto de respaldo de energía de una empresa distribuidora de grupos electrógenos, siguiendo las praxis recomendadas en la Guía del PMBOK, 7° Edición, a fin de determinar el impacto de la implementación de un Plan de Respuesta a los Riesgos. El proyecto se encuentra ubicado en el distrito de Arequipa (Centro), provincia de Arequipa, departamento de Arequipa.
Con el propósito de abordar un planteamiento específico, a través de un enfoque explicativo y diseño pre-experimental, se buscó una gestión adecuada de los riesgos por medio de actividades incluidas en la propuesta metodológica durante un período de diez meses, desde septiembre de 2021 hasta julio de 2022.
Se desarrolló un Plan de Gestión de Riesgos que estableció la metodología y las directrices para cada subproceso de la gestión de riesgos. Se identificaron 48 riesgos, de los cuales 19 fueron priorizados como " altos" a través del análisis cualitativo. El Valor Monetario Esperado (VME) obtenido mediante el análisis cuantitativo fue de $71,395, lo que implica un impacto negativo en el proyecto debido a una gestión inadecuada de riesgos.
Se estimó un costo de inversión de $19,800 para poner en marcha del Plan de Respuesta, y se logró una eficiente implementación que redujo los costos de las actividades preventivas planificadas en un 49.49%, lo que representó un ahorro de $9,800 en el margen del proyecto. Durante la etapa de ejecución, se materializaron 10 riesgos que fueron gestionados de acuerdo con el Plan de Contingencia; el costo real de las actividades correctivas fue de $5200.
En cuanto al costo beneficio, cada dólar invertido en llevar a cabo el Plan de Respuesta generó una reducción de $4.04 en los impactos asociados a una gestión deficiente de riesgos. Además, el margen final del proyecto aumentó del 10% al 10.62% en comparación con lo planificado, reflejando los resultados obtenidos en el desarrollo del proyecto.
Mostrar más
The present investigation addressed risk management in the energy backup project of a generator set trading company, following the good practices of the PMBOK Guide, 7th Edition, to determine the impact of implementing a Risk Response Plan. The project is located in the Arequipa district (Centro), Arequipa province, Arequipa department.
Through an applied research methodology, with an explanatory approach and a pre-experimental research design, efficient risk management was sought. The research proposes deploying activities related to the proposed methodology, such as planning, identification, qualitative analysis, quantitative analysis, response planning, and risk monitoring, over a period of ten months, from September 2021 to July 2022.
A Risk Management Plan was developed that established the methodology and guidelines for each sub-process of risk management. Forty-eight risks were identified, of which nineteen were prioritized as " high" through qualitative analysis. The Expected Monetary Value (EMV) obtained through quantitative analysis was $71,395, implying a negative impact on the project due to inadequate risk management.
An investment cost of $19,800 was estimated for the implementation of the Risk Response Plan, and an efficient implementation was achieved, reducing the costs of planned preventive activities by 49.49%, resulting in a saving of $9,800 in the project's margin. During the execution stage, ten risks materialized and were managed according to the Contingency Plan, with the actual cost of corrective activities amounting to $5,200.
In terms of cost-benefit, each dollar invested in the implementation of the Risk Response Plan generated a reduction of $4.04 in the impacts associated with poor risk management. Additionally, the project's final margin increased from 10% to 10.62% compared to the planned value, reflecting the results obtained in the project's development.
Mostrar más
Bibliographic citation
Caceres, K. C. (2023). Gestión de riesgos en los proyectos de energía de una empresa distribuidora de grupos electrógenos a través de un plan de repuesta bajo la guía del PMBOK [Tesis de maestría, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/36117
Subject
Collections
- Tesis [76]
The following license files are associated with this item:
Related items
Showing items related by title, author, creator and subject.
-
La gestión del costo para la mejora de la satisfacción de los directivos, el personal técnico y la rentabilidad, bajo el enfoque de la guía PMBOK, en el proyecto de la planta de detonadores no eléctricos Chemtrade, distrito Végueta, provincia Huaura, región Lima, 2017
López Chiroque, Renzo Rodrigo; Rafael Bazan, George Yoao (Universidad Privada del Norte, 2018-09-10)Acceso abiertoRESUMEN Durante el 2017, en la empresa JOSLOP Contratistas Generales S.A.C., se implementó la gestión de costos en el proyecto “Planta de Detonadores no Eléctricos CHEMTRADE”, bajo el enfoque de la guía PMBOK (Project ... -
Propuesta de mejora de un sistema de gestión de la seguridad y salud en el trabajo bajo la Ley 29783 y su modificatoria, D. S. 005-2012 para minimizar los riesgos en el área de laboratorio de la Clínica San Lorenzo S. R. L. - Cajamarca 2018
Atalaya Rodriguez, Daisy Karina (Universidad Privada del Norte, 2018-02-26)EmbargadoEl presente proyecto de investigación estudia la situación actual del área de laboratorio de la clínica San Lorenzo S.R.L perteneciente al sector de salud, la cual presenta problemas de ruido de varios equipos, ... -
Diagnosis of the integration management of mining projects from the conceptual stage to the start of operations in Cajamarca - Peru, 2018 [Diagnóstico de la gestión de integración de proyectos mineros desde la etapa conceptual hasta el arranque de operaciones en Cajamarca - Perú, 2018]
Zamora, Eduardo (LACCEI, 2020-09-15)Acceso abiertoRESUMEN Este estudio analiza la primera fase de la gestión, las prácticas aplicadas y los requisitos de un proyecto minero. Se ha entrevistado a 9 directores y/o gerentes de proyectos mineros, teniendo como objetivos del ...